Let’s be direct: a messy permitting process costs you money. Every day a store isn’t open is a day of lost revenue, and when you’re managing projects across multiple states, those delays add up fast. Permitting isn’t just an administrative hurdle; it’s a critical business function that directly impacts your bottom line. A strong multi-site permit management strategy transforms this process from a cost center into a competitive advantage. It’s about building a repeatable system that shortens approval times, ensures predictable openings, and pulls revenue forward. In this article, we’ll cover how to build a process that protects your budget and accelerates your growth.
Key Takeaways
- Build a repeatable permitting system: Create predictability across all jurisdictions by developing Standard Operating Procedures (SOPs), jurisdiction-specific checklists, and a strict quality control process. This ensures every submittal is clean, complete, and consistent.
- Demand a single source of truth: Move your projects out of messy spreadsheets and email chains. A centralized dashboard gives your entire team real-time visibility into permit statuses, documents, and communication, eliminating guesswork and keeping rollouts on schedule.
- Measure what matters to move faster: Track key performance indicators (KPIs) like permit cycle time and first-pass approval rates. This data helps you identify bottlenecks and prove how a streamlined process directly connects to opening stores and generating revenue sooner.
What is Multi-Site Permit Management (And Why It Matters)?
When you’re rolling out dozens of new locations, remodels, or rebrands across the country, permitting isn’t just one task on a long checklist—it’s the critical path that determines when your doors open. Multi-site permit management is the practice of handling all your construction permits for every location from a single, central point of command. Think of it as the air traffic control for your entire development pipeline. Instead of teams in different regions running their own separate plays, you have one unified strategy.
This matters because consistency is king in multi-site rollouts. A centralized approach helps you maintain brand standards, improve team productivity, and scale your operations efficiently without reinventing the wheel for every new jurisdiction. When you have a clear, repeatable process, you can anticipate timelines, budget accurately, and get ahead of potential roadblocks. Without it, you’re left scrambling. Each new city becomes a new puzzle, leading to inconsistent timelines, surprise costs, and a lot of unnecessary stress for your team. Ultimately, a strong multi-site permit strategy is what separates a smooth, predictable rollout from one plagued by delays and stalled revenue.
How Permitting Impacts Your Bottom Line
Let’s be direct: a messy permitting process costs you money. When you’re managing projects across multiple jurisdictions, the administrative burden can quickly become overwhelming. Each municipality has its own set of rules, forms, and review timelines. Trying to keep track of it all is a full-time job that can easily lead to missed deadlines and costly errors. These aren’t just minor hiccups; they cause significant project delays that push back opening dates. Every day a store isn’t open is a day of lost revenue, directly impacting your bottom line. A single forgotten document or incorrect form can trigger a cycle of resubmittals, stopping your project in its tracks while you burn cash on overhead.
The Core Pieces of the Puzzle
A successful multi-site permitting strategy isn’t about magic; it’s about having the right pieces in place. First, you need a complete, top-down view of your entire portfolio. This means seeing the status of every permit, for every project, in one place. Next is collaboration. Your internal teams, architects, and general contractors all need to be on the same page. A good system also requires meticulous document management to ensure everyone is working from the latest plans. Finally, you need a way to spot potential delays early. Proactive problem-solving is key to keeping your projects moving forward without waiting for a red flag from the city reviewer.
The Benefits of a Streamlined Process
When you get your permitting process right, the benefits extend far beyond just getting a piece of paper. A streamlined system acts as a central hub for all your projects, bringing predictability to what can often feel like a chaotic part of development. You’ll see a dramatic reduction in paperwork and administrative headaches, freeing up your team to focus on higher-value work. More importantly, you’ll build a repeatable model for success. This means fewer errors, faster approvals, and a much lower risk of fines or stop-work orders. The end result is simple: your locations open on time, your revenue starts flowing sooner, and your growth plans stay on track.
Why Multi-Site Permitting Feels So Hard
If you’re managing a national rollout, you know the feeling. What should be a straightforward process quickly turns into a complex web of delays, corrections, and missed deadlines. You’re not imagining it—managing permits across multiple jurisdictions is incredibly challenging by design. Each project brings its own unique set of hurdles, and when you multiply that by 20, 50, or 100+ locations, the complexity grows exponentially. Understanding these core challenges is the first step to building a more predictable, scalable process for your team.
Juggling Complex Local Regulations
The biggest headache in multi-site permitting is that there’s no single rulebook. Building permit requirements are hyper-local and can change dramatically from one county to the next, let alone across state lines. One jurisdiction might have stringent requirements for hurricane-proofing, while another is focused on seismic activity or snow loads. This is because local building codes are designed to address specific regional needs. For your team, this means every new site is like starting from scratch. You can’t simply copy and paste your process from a project in Florida to one in Colorado. This constant need to research and adapt makes it nearly impossible to standardize your approach and creates endless opportunities for error.
Drowning in Administrative Work
Beyond the regulations themselves is the sheer volume of paperwork. Managing permits for a national rollout generates a mountain of administrative tasks. Each jurisdiction has its own application forms, submission protocols, and review timelines. For every single project, your team has to track countless deadlines, follow up with plan checkers, and respond to comments—all while keeping the next batch of projects moving. When you’re dealing with dozens of sites at once, this manual effort becomes unsustainable. It’s incredibly difficult for a small team to keep track of every detail, which often leads to missed deadlines, incomplete applications, and preventable project delays that stall your open dates.
Keeping Track of Documents
Where is the latest version of the architectural plans? Did the structural engineer send over the updated calculations? Who has the response to the city’s last correction letter? When you’re managing multiple projects, document control can quickly spiral out of control. Files get buried in email chains, saved on different local drives, or lost in confusing folder structures. Working from an outdated document can lead to an immediate rejection from the plan checker, forcing a costly resubmittal and pushing your timeline back by weeks. A reliable system for document management and version control isn’t just a nice-to-have; it’s essential for ensuring your team submits a clean, accurate package every time.
Closing Communication Gaps
A single permit submittal involves a long list of stakeholders: your internal development team, architects, engineers, general contractors, and the plan reviewers at the Authority Having Jurisdiction (AHJ). Getting everyone on the same page is a massive challenge. Information gets lost in translation between emails and phone calls, leading to misunderstandings and misaligned expectations. A simple question from the city can get stuck in someone’s inbox for days, halting all progress. Without a central hub for stakeholder communication, your team is left chasing down information, which wastes valuable time and increases the risk of errors that lead to more back-and-forth with the city.
Allocating the Right Resources
Managing permits for 40, 75, or even 100+ sites across the country is a full-time job that requires a unique skill set. Each jurisdiction operates differently, and their specific processes require local knowledge and established relationships. Building an in-house team with that breadth of expertise is a significant investment in both headcount and training. The alternative—stretching your existing project managers thin—isn’t sustainable and puts your revenue goals at risk. When a single permit delay can cost months of lost sales, it’s critical to improve your resource allocation or bring in an expert partner.
What to Look For in a Permit Management Solution
When you’re managing dozens of projects at once, the right tools aren’t just a nice-to-have—they’re essential for keeping your rollouts on track. A great permit management solution moves you out of messy spreadsheets and endless email chains into a streamlined, predictable system. It gives your entire team—from construction managers to VPs of development—the visibility and control needed to prevent delays. But not all platforms are created equal. Here are the core features you should look for to ensure you’re getting a system that can handle the complexities of multi-site permitting.
A Centralized Dashboard for Everything
Forget about hunting through spreadsheets and email threads for updates. The foundation of any effective permit management solution is a centralized dashboard that brings all your projects into a single view. This is your command center. From here, you should be able to see the status of every permit, for every location, at a glance. For development and construction leaders, this provides the high-level oversight needed to spot potential bottlenecks before they derail a timeline. It gives your team one source of truth, ensuring everyone is working from the same playbook and can coordinate their efforts without having to chase down information. This clarity is key to managing a national rollout successfully.
Real-Time Tracking and Status Alerts
Waiting for a status update from a jurisdiction can feel like a black box. A top-tier solution removes the guesswork with real-time tracking. Instead of your team spending hours calling and emailing city officials, the system should provide instant visibility into where each permit is in the approval process. Look for a platform that acts as a central hub, allowing you to monitor the status of permits across different municipalities. Proactive status alerts are also a must. Your team should be notified automatically when a permit moves to the next stage, when a correction is requested, or when an approval is granted. This keeps projects moving forward and lets your team focus on problem-solving, not playing phone tag.
A Smart Document Control System
Permit packages are document-heavy. From architectural drawings and engineering reports to application forms and correspondence, keeping everything organized is a massive challenge. A smart document control system is non-negotiable. This feature provides a secure, centralized repository for all project-related files, ensuring nothing gets lost in an inbox or saved to the wrong folder. With proper version control, your team can be confident they are always working with the most current documents, which is critical for avoiding costly resubmittals based on outdated plans. Easy access to organized paperwork means faster submittals, quicker responses to reviewer comments, and a much smoother process from start to finish.
Automated, Error-Proof Workflows
Small manual errors—a typo on a form, a missing signature, an incorrect fee calculation—can lead to big delays. These are the kinds of mistakes that get applications rejected, forcing you back to square one. That’s why automated workflows are so powerful. A good system will use automation to pre-fill forms, flag missing information, and guide your team through the submittal process for each unique jurisdiction. By digitizing and standardizing these steps, you can significantly reduce the risk of human error. This not only makes your internal process more efficient but also builds a reputation with city reviewers for submitting clean, complete packages, which can help streamline approvals in the long run.
Built-In Compliance Monitoring
Compliance is the bedrock of permitting. With regulations varying wildly between jurisdictions and changing frequently, staying on top of it all is a full-time job. A solution with built-in compliance monitoring can be a lifesaver. This feature helps ensure that every application meets local regulatory requirements before it’s even submitted. It can flag potential issues, track inspection deadlines, and manage license renewals, protecting your projects from fines and stop-work orders. By automating parts of the risk assessment process, you can move forward with confidence, knowing that your projects are set up to meet all necessary codes and standards from day one. This proactive approach is essential for predictable project timelines.
Simple Team Collaboration Tools
Permitting is a team sport. Your internal team, architects, engineers, and general contractors all need to be in sync. A permit management solution should facilitate this, not create another silo. Look for simple, effective collaboration tools that centralize communication within the platform. Instead of scattered emails and text messages, conversations about a specific permit should be tied directly to that project in the system. This creates a clear record of communication and ensures everyone has access to the same information. When your team can easily share updates, ask questions, and assign tasks in one place, you eliminate confusion and keep everyone aligned on the next steps.
How to Choose the Right Permit Partner
Selecting a permit partner is a strategic decision that directly impacts your project timelines, budget, and ability to generate revenue. The right partner acts as an extension of your team, bringing expertise and efficiency to the table. The wrong one can create bottlenecks, add administrative headaches, and put your opening dates at risk. To make the best choice, you need to look beyond the sales pitch and evaluate potential partners on a few core criteria. By focusing on capabilities, integrations, scalability, support, and the true cost-benefit, you can find a partner who will help you build a repeatable, predictable permitting process for every project in your pipeline.
Define Your Must-Have Capabilities
Before you start evaluating options, create a clear checklist of your non-negotiables. As a multi-site leader, you need more than just basic submittal services. Think about what your team needs to operate efficiently across dozens of jurisdictions. Do you need a partner with proven expertise in your specific vertical, like restaurants or retail? Is a centralized dashboard for tracking KPIs and project status a must-have? Your list should include features that give you total visibility and control, such as real-time status updates and a single portal for all documents. Having a clear list of essential capabilities ensures you’re comparing apples to apples and choosing a partner who can meet the complex demands of your national rollout.
Check for Critical Integrations
Your permitting process doesn’t happen in a vacuum. It needs to connect seamlessly with the other systems your team relies on every day, from project management software to architectural design tools. A partner whose platform can’t integrate with your existing tech stack will only create more manual work and data silos. Ask potential partners how their system communicates with other software. Can you easily upload plans from your AOR? Can status updates sync with your internal project management dashboard? The goal is to create a single source of truth, and strong system integration is critical for making that happen. This prevents miscommunication and ensures everyone is working from the most current information.
Plan for Future Growth
The partner you choose today should be able to support your portfolio tomorrow. If you’re planning to expand into new markets or increase your project volume, you need a partner who can scale with you. A process that works for 20 projects might break down at 50 or 100. Ask pointed questions about their capacity and scalability. How do they handle a sudden increase in project load? What is their process for researching and navigating new, unfamiliar jurisdictions? A partner with a digital-first approach and standardized internal processes is better equipped to handle growth without sacrificing quality or speed, ensuring your permitting process remains an asset, not a liability.
Ask About Support and Training
A powerful software portal is only as good as the team behind it. When you’re facing a tight deadline or a tricky jurisdiction, you need responsive, expert support. Before signing a contract, get a clear understanding of the partner’s support structure. Will you have a dedicated account manager who understands your portfolio? What are their standard response times? A true partner offers more than just a digital tool; they provide a comprehensive solution that includes proactive communication and expert guidance. Also, ask about their onboarding and training process to ensure your team can get up to speed quickly and make the most of the partnership from day one.
Run a Cost-Benefit Analysis
Finally, look beyond the initial price tag and evaluate the total value a partner provides. The cheapest option is rarely the most cost-effective if it leads to delays, resubmittals, and stalled openings. Calculate the true cost of your current permitting process, factoring in staff hours, correction fees, and the revenue lost for every day a project is delayed. A good partner should be able to help you quantify the return on investment they provide, from reducing days-to-permit to pulling revenue forward. By focusing on financial KPIs like cost per permit issued and the impact on your opening schedule, you can make a data-driven decision that benefits your bottom line.
Build a Repeatable, Scalable Permitting Process
When you’re managing dozens of projects at once, you can’t afford to reinvent the wheel for every single permit. Success depends on having a system—a predictable, repeatable process that works whether you’re opening a store in Omaha or Toronto. A scalable process eliminates guesswork, reduces costly errors, and gives you a clear playbook for entering new markets with confidence. It transforms permitting from a chaotic, reactive scramble into a strategic advantage. By standardizing your approach, you ensure every project kicks off on the right foot, with a clear path to getting the approvals you need to open on time and start generating revenue.
Develop Standard Operating Procedures (SOPs)
Think of Standard Operating Procedures (SOPs) as your team’s single source of truth for permitting. These are clear, documented guidelines that outline every step of the process, from initial due diligence to final inspection. Creating company-wide rules ensures everyone—from your internal team to your architects and general contractors—is working from the same playbook, delivering consistent, high-quality work. Your SOPs should detail how to gather required documents, who is responsible for quality control on applications, and the protocol for communicating with jurisdictions. A strong set of SOPs makes onboarding new team members easier and ensures your standards are met on every project.
Create Jurisdiction-Specific Checklists
A generic permitting checklist is a recipe for resubmittals. Because building permit rules are different everywhere, a one-size-fits-all approach will inevitably miss the specific nuances of a local authority. The requirements can change dramatically from one county to the next, let alone across state lines. The solution is to build and maintain detailed checklists for each jurisdiction you work in. These checklists should specify every required form, drawing format, and local ordinance. This level of detail is your best defense against incomplete applications and ensures you submit a clean package that sails through the review process. This is where an experienced permit expediter can be invaluable, as they’ve already done the legwork.
Set Clear Communication Protocols
Permitting delays are often communication problems in disguise. When your architects, contractors, and internal teams aren’t on the same page, information gets lost and deadlines get missed. Establish a firm rhythm for communication from the very start. This could include daily check-ins on high-priority projects or standing weekly calls with all stakeholders to review progress and tackle roadblocks together. Define who needs to be looped in on which decisions and what platform you’ll use for updates. A centralized portal where everyone can see real-time status updates is ideal, as it keeps all communication and documentation in one place and ensures total transparency.
Implement Quality Control Measures
Submitting an application with a missing signature or an incorrect fee is an unforced error that can set your timeline back by weeks. That’s why a formal quality control (QC) step is non-negotiable. Before any package is sent to a jurisdiction, it should undergo a thorough review to ensure it’s 100% complete and accurate. This QC check is your final line of defense against common mistakes that lead to rejections. Some teams use automated tools to quickly check applications for completeness, which helps maintain compliance and flags issues before they cause delays. This simple step is one of the most effective ways to reduce resubmittals and shorten your overall days-to-permit.
Map Out Your Risk Management Plan
Even the best-laid plans can hit a snag. A key staff member at the planning department might go on vacation, or a newly elected official could change a local interpretation of a code. A proactive risk management plan helps you anticipate these potential roadblocks and outlines your response in advance. Identify the most common risks in your permitting process—like zoning hurdles, utility connection delays, or historic preservation reviews—and map out a clear plan of action for each. This allows your team to pivot quickly and effectively when challenges arise, minimizing their impact on your project timeline and keeping your rollout on track.
Measure What Matters: Tracking Permitting KPIs
You can’t fix what you can’t see. For multi-site construction programs, managing by gut feeling just doesn’t scale. When you’re juggling dozens of projects across different states and municipalities, data is your best friend. It helps you spot bottlenecks, predict timelines, and make smarter decisions that keep your rollouts on track. Tracking the right key performance indicators (KPIs) transforms permitting from a reactive scramble into a predictable, strategic function. It’s how you move from constantly putting out fires to building a process that gets stronger with every project. By focusing on a few core metrics, you can gain clear visibility into your permitting performance, hold your partners accountable, and directly connect your team’s work to the company’s bottom line.
Define Your Key Performance Indicators
Before you can start improving, you need to know what “good” looks like. Key Performance Indicators (KPIs) are the specific, measurable metrics that tell you if your permitting process is hitting its goals. Instead of getting lost in a sea of data, focus on the handful of numbers that matter most. Start with the basics: average permit cycle time, number of resubmittals per project, and cost per permit. These metrics give you a baseline to measure against. A good permit management solution should provide dashboards for key performance indicators that make it easy to see your performance at a glance, helping you tailor tracking to your specific needs.
Track Time and Cost Savings
For any construction or development leader, time and money are the ultimate measures of success. The most critical KPI here is your permit cycle time, which measures the total time from application submission to final approval. Tracking this helps you identify which jurisdictions are causing delays and where your process has inefficiencies. Another key metric is the cost per permit issued. This includes not just municipal fees but also the internal and external labor costs associated with preparing and managing the application. By monitoring these financial KPIs, you gain clear insights into the efficiency of your permitting process and can spot budget variances before they become major problems.
Monitor Your Compliance Rate
How often are your permit applications approved on the first try? Your first-pass approval rate is a powerful indicator of the quality and completeness of your submittal packages. A low rate, meaning a high number of corrections or resubmittals, points to inconsistencies in your process that are costing you valuable time. Every round of revisions adds weeks, if not months, to your project timeline. Monitoring this KPI helps you enforce quality control and ensures your team or partner is delivering clean, accurate applications that sail through review. A high compliance rate is the foundation for a predictable permitting timeline and is essential for keeping a multi-site rollout on schedule.
Assess the Impact on Revenue
Permitting isn’t just an administrative hurdle; it’s a critical step that directly impacts when your business can start generating revenue. Delays in approvals mean delays in store openings, which pushes back your return on investment. The most important connection to make is between a shorter permit cycle time and an earlier open date. By reducing your average days-to-permit, you pull revenue forward. Think about it: if you can shave three weeks off the permitting timeline for 50 new locations, what does that mean for your quarterly earnings? Streamlining your process with the right partner or permit management software doesn’t just save time—it accelerates cash flow and allows your team to handle more projects efficiently.
Create a Cycle of Improvement
Tracking KPIs isn’t just about creating reports; it’s about fueling a cycle of continuous improvement. Your data should tell a story and guide your strategy. Are you consistently seeing delays in a specific region? Maybe your checklists for that area need an update. Is one type of permit consistently getting flagged for corrections? It might be time for some targeted team training. Using your performance data helps you make proactive adjustments. This approach turns every project into a learning opportunity, allowing you to refine your standard operating procedures and build a smarter, more resilient permitting machine that gets more efficient with every rollout.
Prepare Your Permitting Process for the Future
As your brand grows, your permitting process needs to keep pace. A system that works for 10 locations might buckle under the pressure of 50 or 100. Future-proofing your approach isn’t just about adopting new software; it’s about building a resilient, adaptable framework that supports your expansion goals. This means thinking ahead about scalability, technology, and your team’s capabilities. By anticipating future challenges and opportunities, you can create a permitting engine that doesn’t just keep up with your rollouts but actively accelerates them, ensuring you can enter new markets and launch new projects without hitting predictable roadblocks. A forward-thinking strategy turns permitting from a reactive necessity into a competitive advantage.
Plan for Scalability from Day One
Your next big rollout shouldn’t break your process. When designing your permitting workflow, think about where you’ll be in two, five, or even ten years. Will your current system handle double the projects across three times as many jurisdictions? Planning for scalability means choosing partners and permit management software that can grow with you. Look for solutions that can manage an increasing volume of applications without sacrificing quality or speed. This proactive mindset prevents you from having to overhaul your entire system in the middle of an aggressive expansion, saving you time, money, and a whole lot of headaches down the road.
Integrate with New Technology
Technology is reshaping every aspect of construction, and permitting is no exception. Innovations like AI are making it possible to streamline workflows, catch errors before they cause delays, and ensure compliance with greater accuracy. For example, some platforms can use AI-powered tools to automate risk assessments and accelerate the approval process. Integrating these advanced technologies helps you move faster and with more confidence. By embracing tech, you can transform your permitting process from a manual, time-consuming task into a highly efficient, data-driven operation that supports your project timelines instead of holding them back.
Invest in Your Team’s Growth
The best tools are only as effective as the people using them. As you adopt new systems and processes, it’s crucial to invest in your team’s development. This means providing thorough training on any new software and creating clear documentation for your standard operating procedures. When your team understands the “why” behind the process and feels confident using the tools at their disposal, they become more proactive and efficient. Empowering your team with the right skills ensures they can leverage new technologies effectively, leading to cleaner submittals, fewer errors, and a smoother workflow for every project in your pipeline.
Stay on Top of Regulatory Changes
Building codes and local ordinances are constantly evolving. A permit that was approved last year might get rejected today because of a new regulation. Staying informed about these changes across dozens or hundreds of jurisdictions is a massive undertaking, but it’s essential for avoiding costly delays. A future-proof process includes a reliable method for monitoring regulatory updates. Whether you use software with built-in compliance monitoring or rely on a permit partner who lives and breathes this stuff, having a system to track changes ensures your applications are always up-to-date, compliant, and ready for a swift approval.
Find Opportunities to Automate
How much time does your team spend on repetitive, manual tasks like filling out forms, chasing down signatures, or sending follow-up emails? Every minute spent on administrative work is a minute not spent on strategic planning. Automation is key to reclaiming that time. By identifying opportunities to automate workflows, you can reduce the risk of human error, improve consistency, and free up your team to focus on higher-value activities. From automated status alerts to digital document routing, even small automations can add up to significant gains in speed and efficiency across your entire project portfolio.
Related Articles
- Permitting Services for All Industries – Permit Place
- Permit Place Client Project Portal – Permit Place
- Permitting 104 – Permit Place
- A Complete Permit Cheat Sheet – Permit Place
- How to Use Your Permit Place Client Portal – Permit Place
Frequently Asked Questions
We already have project managers. Why can’t they just handle the permits? Your project managers are certainly capable, but their time is best spent managing budgets, schedules, and contractors—not chasing down plan checkers. Permitting is a specialized skill that requires deep knowledge of hyper-local codes and relationships with city officials. When you offload that administrative burden, you free up your PMs to focus on their core responsibilities, which keeps the entire project running more smoothly and prevents them from becoming a bottleneck.
Is it better to build an in-house permitting team or work with an external partner? This really comes down to a question of scale and geography. If your projects are concentrated in just a few cities, an in-house expert can be a great asset. But for a national rollout, building a team with genuine expertise in dozens or hundreds of different jurisdictions is incredibly expensive and difficult to manage. A dedicated partner gives you immediate access to that nationwide knowledge base without the overhead of hiring and training a large, specialized team.
How can I justify the cost of a dedicated permit partner or software to my leadership? Shift the conversation from an expense to an investment in speed. The real cost isn’t the partner’s fee; it’s the lost revenue for every day a store opening is delayed. Calculate what a single day of delay costs your company across 50 new locations. A strong permit partner reduces your permit cycle time, which means you open sooner and start generating revenue earlier. It’s about trading a predictable cost for accelerated cash flow and significantly less risk.
My company works with several different architects and contractors. How does a centralized system keep them all on the same page? A centralized portal acts as the single source of truth for everyone involved in the project. Instead of critical information getting lost in endless email chains, all communication, documents, and status updates live in one place. Your architect, engineer, and internal team all see the same real-time information. This eliminates version control nightmares and ensures that when the city asks for a revision, the right person sees it and can act on it immediately.
What’s the difference between a simple permit runner and a true permit management partner? A permit runner is a transactional service; you hand them a completed package, and they physically drop it off at the city office. A true permit management partner is a strategic part of your team. They own the entire process, starting with due diligence and quality control to ensure your application is clean before it’s ever submitted. They proactively communicate with the jurisdiction on your behalf and provide you with total visibility into the process, helping you build a repeatable system for success.