Solon, OH Building Permits Guide
By Permit Place | Last updated: February 2026
Solon, OH building permit timeline: Plan review takes 7 to 30 days depending on project type. Contact the building department for current processing times.
Building permit review in Solon, OH typically takes between 7 and 30 days depending on project type and complexity. Below you will find specific review timelines broken down by permit type, project size, and review stage.
Solon Plan Review Timeline
-
The plan review process in Solon, OH, for building permits currently takes 7-10 business days for the first review after receiving a complete permit application and required documentation. This applies to both residential and commercial applications, which are reviewed by multiple departments including Building, Planning, Engineering, and Fire (commercial only). The Ohio Board of Building Standards allows up to 30 calendar days for the plan review and approval process.
-
For subsequent submittals or changes to approved construction documents, the revised plans must be resubmitted and will again go through the review process. There is a plan revision fee of $50 for any revised residential plans submitted after initial approval.
-
The reviews for residential permits occur simultaneously among the involved departments, which helps streamline the process.
-
Applicants are notified by email if additional information is needed during the review, and contractors must be registered before permit issuance.
No specific additional timing details for subsequent reviews beyond the initial 7-10 business days or the 30-calendar-day allowance by the Board of Building Standards were found directly on the Solon, OH official sources.
If more precise timing for subsequent reviews is needed, contacting the Solon Building Department directly would be advisable.
"" applies if strict breakdowns for subsequent plan check times beyond the above are requested.
Last verified: June 2025 | Source: Solon Building Department
Need it faster? Permit Place can expedite your Solon permits
What Building Permits Do You Need in Solon?
Solon requires permits for most construction activity. The type of permit depends on your project scope.
Commercial Permits
- New commercial construction: full plan review with the longest timeline
- Tenant improvements and interior buildouts: plan review for structural, electrical, plumbing, and mechanical changes
- Change of use: required when converting building use (for example, retail to restaurant)
- Shell and core: separate from tenant improvement permits
Residential Permits
- New home construction: full plan review including structural, mechanical, electrical, and plumbing
- Additions and remodels: required when modifying structure or adding square footage
- Decks, pools, fences: separate permits with typically faster review
Trade Permits
Individual trade permits are typically required for electrical, plumbing, mechanical (HVAC), and fire sprinkler work.
How the Solon Permit Review Process Works
Step 1: Application Submission
Submit your permit application through the Solon building department. Applications are reviewed for completeness before being assigned to a plan reviewer.
Step 2: Plan Review
The city reviews your submitted plans for building code compliance, structural integrity, fire safety, energy code, and ADA accessibility. Commercial projects are reviewed by multiple departments at the same time.
Step 3: Corrections and Resubmittal
If the city issues correction comments, you will need to revise your plans and resubmit. Each correction cycle adds another review period. Most commercial projects go through 2 to 3 correction cycles.
Step 4: Permit Issuance
Once all review departments approve your plans, the building permit is issued. Schedule inspections as work progresses.
Note: These timelines reflect general review periods. Large or complex projects may take longer. Request a quote from Permit Place for a project-specific estimate, or get an instant due diligence report from PermitNow.io.
Solon Building Permit Costs
Permit fees in Solon vary based on project type and valuation.
Commercial
- Tenant improvements: $500 to $5,000+
- New commercial construction: $2,000 to $25,000+ (based on valuation)
- Plan review fee: typically 50-65% of the building permit fee
Residential
- Small projects (decks, pools, fences): $50 to $300
- Home additions and remodels: $200 to $2,000+
- New home construction: $1,000 to $10,000+ (based on valuation)
For a detailed permit cost breakdown specific to your project, get a free due diligence report from PermitNow.io.
Trade Permits
- Electrical: $50 to $500
- Plumbing: $50 to $500
- Mechanical: $50 to $500
Fee ranges are estimates. Actual fees depend on project valuation and scope. Contact the Solon building department or Permit Place for exact costs.
Solon Building Department
Solon Building Department
Frequently Asked Questions About Solon Building Permits
How long does it take to get a building permit in Solon?
Plan review in Solon, OH takes 7 to 30 days for the initial review cycle. Projects that receive correction comments will need additional review cycles, each adding time to the total. Most commercial projects go through at least two review cycles before approval.
What is the difference between residential and commercial permit review in Solon?
Commercial projects in Solon require review by multiple departments (building, fire, public works, and sometimes health), which adds time. Residential projects typically involve fewer review disciplines and can be processed faster. Tenant improvements fall between the two depending on scope.
Can I speed up the permit process in Solon?
The most effective way to speed up the permit process in Solon is to submit complete, code-compliant plans on the first attempt. This reduces correction cycles, which are the primary cause of delays. Permit Place helps ensure your application is complete before submission.
Do I need a permit for a tenant improvement in Solon?
Yes. Most interior buildouts in Solon that involve structural changes, electrical work, plumbing, or HVAC modifications require a building permit. Simple cosmetic changes (paint, flooring, non-structural work) typically do not require a permit.
How much does a building permit cost in Solon?
Permit fees in Solon are calculated based on project valuation and type. Commercial projects typically pay $500 to $25,000+ in total permit and plan review fees. The exact cost depends on project scope, square footage, and any additional trade permits required.
Can a permit expediter help with my Solon project?
Yes. Permit Place expedites building permits in Solon and 600+ other jurisdictions. We handle everything from application preparation through plan review, corrections, and permit issuance. Our clients typically get permits faster because we submit complete applications that reduce correction cycles.
What building permits do I need in Solon, OH?
Most construction in Solon requires a building permit. This includes new construction, tenant improvements, change of use, additions, and major renovations. Separate trade permits for electrical, plumbing, mechanical, and fire protection are also typically required. For a project-specific permit requirements report, use PermitNow.io.
Permit Review Times in Other Ohio Cities
Need Help With Solon Building Permits?
Permit Place has helped hundreds of businesses get permits in Solon and across Ohio. We handle everything from application to approval so you can focus on building.
Request a Free Quote
Free DD Report
Want to know exactly what permits your project needs? Get an instant due diligence report from PermitNow.io. View a free demo DD report