Scranton, PA Building Permits | Review Times and Process

Scranton, PA Building Permits Guide

Scranton, PA building permit timeline: Initial plan review takes approximately 90 days. Contact the building department for current processing times.

Building permit review in Scranton, PA takes approximately 90 days for initial plan review. Here is what you need to know about permit timelines, costs, and the review process in Scranton.

Scranton Plan Review Timeline

Analysis: The City of Scranton’s official building and permit webpages do not specify a standard time frame for the initial or subsequent plan review or submittal turnaround. The only relevant timing on the site is that applications for building permits should be submitted 4 to 90 days before the project begins, but this refers to the timing for application submission, not the review or plan check process itself. There are no stated deadlines or expected durations for first or subsequent plan reviews in the available documents.

Note: The Planning Commission in Scranton is required to act on preliminary or final plans within 90 days after the first regular meeting at which the plan is considered, but this applies only to planning documents, not to standard building plan reviews. This may not cover all building department reviews.

If you are looking for standard plan check timeframes (such as "first submittal review within X days"), this information is not provided on the City of Scranton’s website.

Last verified: June 2025 | Source: Scranton Building Department

Need it faster? Permit Place can expedite your Scranton permits

What Building Permits Do You Need in Scranton?

Scranton requires permits for most construction activity. The type of permit depends on your project scope.

Commercial Permits

  • New commercial construction: full plan review with the longest timeline
  • Tenant improvements and interior buildouts: plan review for structural, electrical, plumbing, and mechanical changes
  • Change of use: required when converting building use (for example, retail to restaurant)
  • Shell and core: separate from tenant improvement permits

Residential Permits

  • New home construction: full plan review including structural, mechanical, electrical, and plumbing
  • Additions and remodels: required when modifying structure or adding square footage
  • Decks, pools, fences: separate permits with typically faster review
Need a project-specific permit report? Try PermitNow.io, our AI-powered due diligence tool that researches exactly what permits your project requires, what documents to prepare, and how to submit. Works for residential and commercial projects. View a free demo DD report

Trade Permits

Individual trade permits are typically required for electrical, plumbing, mechanical (HVAC), and fire sprinkler work.

Request a Free Quote

How the Scranton Permit Review Process Works

Step 1: Application Submission

Submit your permit application through the Scranton building department. Applications are reviewed for completeness before being assigned to a plan reviewer.

Step 2: Plan Review

The city reviews your submitted plans for building code compliance, structural integrity, fire safety, energy code, and ADA accessibility. Commercial projects are reviewed by multiple departments at the same time.

Step 3: Corrections and Resubmittal

If the city issues correction comments, you will need to revise your plans and resubmit. Each correction cycle adds another review period. Most commercial projects go through 2 to 3 correction cycles.

Step 4: Permit Issuance

Once all review departments approve your plans, the building permit is issued. Schedule inspections as work progresses.

Note: These timelines reflect general review periods. Large or complex projects may take longer. Request a quote from Permit Place for a project-specific estimate, or get an instant due diligence report from PermitNow.io.

Scranton Building Permit Costs

Permit fees in Scranton vary based on project type and valuation.

Commercial

  • Tenant improvements: $500 to $5,000+
  • New commercial construction: $2,000 to $25,000+ (based on valuation)
  • Plan review fee: typically 50-65% of the building permit fee

Residential

  • Small projects (decks, pools, fences): $50 to $300
  • Home additions and remodels: $200 to $2,000+
  • New home construction: $1,000 to $10,000+ (based on valuation)

For a detailed permit cost breakdown specific to your project, get a free due diligence report from PermitNow.io.

Trade Permits

  • Electrical: $50 to $500
  • Plumbing: $50 to $500
  • Mechanical: $50 to $500

Fee ranges are estimates. Actual fees depend on project valuation and scope. Contact the Scranton building department or Permit Place for exact costs.

Scranton Building Department

Frequently Asked Questions About Scranton Building Permits

How long does it take to get a building permit in Scranton?

Plan review in Scranton, PA takes approximately 90 days for the initial review cycle. Projects that receive correction comments will need additional review cycles, each adding time to the total. Most commercial projects go through at least two review cycles before approval.

Can I speed up the permit process in Scranton?

The most effective way to speed up the permit process in Scranton is to submit complete, code-compliant plans on the first attempt. This reduces correction cycles, which are the primary cause of delays. Permit Place helps ensure your application is complete before submission.

Do I need a permit for a tenant improvement in Scranton?

Yes. Most interior buildouts in Scranton that involve structural changes, electrical work, plumbing, or HVAC modifications require a building permit. Simple cosmetic changes (paint, flooring, non-structural work) typically do not require a permit.

How much does a building permit cost in Scranton?

Permit fees in Scranton are calculated based on project valuation and type. Commercial projects typically pay $500 to $25,000+ in total permit and plan review fees. The exact cost depends on project scope, square footage, and any additional trade permits required.

Can a permit expediter help with my Scranton project?

Yes. Permit Place expedites building permits in Scranton and 600+ other jurisdictions. We handle everything from application preparation through plan review, corrections, and permit issuance. Our clients typically get permits faster because we submit complete applications that reduce correction cycles.

What building permits do I need in Scranton, PA?

Most construction in Scranton requires a building permit. This includes new construction, tenant improvements, change of use, additions, and major renovations. Separate trade permits for electrical, plumbing, mechanical, and fire protection are also typically required. For a project-specific permit requirements report, use PermitNow.io.

Need Help With Scranton Building Permits?

Permit Place has helped hundreds of businesses get permits in Scranton and across Pennsylvania. We handle everything from application to approval so you can focus on building.

Dedicated permit expediter
Commercial and residential
Tenant improvements and TI
Corrections and resubmittals
Faster than self-filing
600+ jurisdictions nationwide

Request a Free Quote
Free DD Report

Want to know exactly what permits your project needs? Get an instant due diligence report from PermitNow.io. View a free demo DD report

Schedule Time to Talk

Quick Answer

A building permit in Scranton, PA is a legal authorization from the Scranton Building Department required before starting any commercial construction, renovation, or tenant improvement project. The permit confirms that proposed work meets local building codes, zoning ordinances, fire safety standards, and ADA accessibility requirements per the International Building Code (IBC).

Scranton Building Permit FAQ

How long does it take to get a building permit in Scranton, PA?

Commercial building permit review in Scranton, PA typically takes 4 to 12 weeks depending on project scope, plan review backlog, and whether corrections are required. Permit Place clients in Scranton often see timelines reduced by 30-60% through proactive management and early coordination with the Scranton Building Department.

How much does a commercial building permit cost in Scranton, PA?

Commercial building permit fees in Scranton, PA vary based on project valuation, square footage, and permit type. Most tenant improvement permits range from $2,000 to $15,000 in city fees. Plan review fees, fire department review, and third-party inspection fees are typically additional.

Can I expedite my building permit in Scranton, PA?

Yes. Many jurisdictions including Scranton offer expedited or priority plan review for an additional fee. Permit Place also reduces timelines by preparing correction-free submittals, scheduling pre-application meetings, and maintaining direct contact with plan reviewers at the Scranton Building Department.

What documents do I need for a building permit in Scranton, PA?

A commercial building permit application in Scranton, PA typically requires: stamped architectural and structural drawings, a completed permit application form, proof of ownership or tenant authorization, contractor license information, energy compliance documents (Title 24 in California or local equivalent), and fire sprinkler or alarm plans if applicable.

Does Scranton require plan review for tenant improvements?

Yes. Scranton requires plan review for most commercial tenant improvement projects, including interior renovations that affect structural, mechanical, electrical, or plumbing systems. Minor cosmetic changes such as paint or carpet may be exempt, but any work involving walls, ceilings, or building systems requires a permit from the Scranton Building Department.

Scranton, PA Permit Process at a Glance

FactorTypical Range
Permit Review Timeline4 - 12 weeks (varies by project scope)
TI Permit Fee Range$2,000 - $15,000 (based on valuation)
Plan Review RequiredYes, for all commercial construction
Online SubmissionAvailable in most jurisdictions
Fire Dept. ReviewRequired for occupied commercial spaces
With Permit Expediter30-60% faster timelines on average
Key FactsScranton, PA Building Permits

Issuing Authority

Scranton Building Department

Review Timeline

4 - 12 weeks for commercial permits

TI Permit Fees

$2,000 - $15,000 typical range

Building Code

International Building Code (IBC)

Expediting

Available through Permit Place

Permit Place Contact

877-277-4289 | [email protected]

Get a Free Quote for Scranton

Sources and References

Data last verified: March 10, 2026 — Source: the Scranton, PA building department

According to the Scranton, PA building department, building permit requirements in Scranton, PA are subject to project type, scope, and valuation. Permit Place has been expediting permits in Scranton as part of our nationwide service covering 2,000+ jurisdictions across 23 states since 2003. For current fee schedules and submittal requirements, consult the official building department or contact Permit Place for a free project assessment.