Sheridan, WY Building Permits Guide
By Permit Place | Last updated: February 2026
Sheridan, WY building permit timeline: Review times vary by project scope and complexity. Contact the building department for current processing times.
Sheridan, WY requires building permits for most construction, renovation, and tenant improvement projects. Below you will find specific review timelines broken down by permit type, project size, and review stage.
Sheridan Plan Review Timeline
For Sheridan, WY, here are the relevant official timeframes for plan review as found on the city’s building department webpage and related documents:
- Time to review first submittal (residential projects): 10 working days for residential projects, assuming all required information is submitted.
- Time to review first submittal (commercial projects): 20 working days for commercial projects, assuming all required information is submitted.
- Time to review subsequent submittals (after corrections or additional information): The city states that the permitting process “normally takes about two weeks if there are no issues found during the review process,” but if additional information is requested, the timeline can be longer. However, explicit timeframes for subsequent submittals (such as a set number of days) are not specified in official documentation.
- Inspection requests and notifications: Requests for inspections should be made before 8AM for same-day inspections. Inspection requests made after 8AM will be scheduled for the next business day.
No explicit timeframes for subsequent submittals (such as second or third reviews) are stated on the official city or building department webpages. The city’s main mention is that additional information or corrections may delay the process, but does not specify a number of days for these subsequent reviews.
Last verified: June 2025 | Source: Sheridan Building Department
Need it faster? Permit Place can expedite your Sheridan permits
What Building Permits Do You Need in Sheridan?
Sheridan requires permits for most construction activity. The type of permit depends on your project scope.
Commercial Permits
- New commercial construction: full plan review with the longest timeline
- Tenant improvements and interior buildouts: plan review for structural, electrical, plumbing, and mechanical changes
- Change of use: required when converting building use (for example, retail to restaurant)
- Shell and core: separate from tenant improvement permits
Residential Permits
- New home construction: full plan review including structural, mechanical, electrical, and plumbing
- Additions and remodels: required when modifying structure or adding square footage
- Decks, pools, fences: separate permits with typically faster review
Trade Permits
Individual trade permits are typically required for electrical, plumbing, mechanical (HVAC), and fire sprinkler work.
How the Sheridan Permit Review Process Works
Step 1: Application Submission
Submit your permit application through the Sheridan building department. Applications are reviewed for completeness before being assigned to a plan reviewer.
Step 2: Plan Review
The city reviews your submitted plans for building code compliance, structural integrity, fire safety, energy code, and ADA accessibility. Commercial projects are reviewed by multiple departments at the same time.
Step 3: Corrections and Resubmittal
If the city issues correction comments, you will need to revise your plans and resubmit. Each correction cycle adds another review period. Most commercial projects go through 2 to 3 correction cycles.
Step 4: Permit Issuance
Once all review departments approve your plans, the building permit is issued. Schedule inspections as work progresses.
Note: These timelines reflect general review periods. Large or complex projects may take longer. Request a quote from Permit Place for a project-specific estimate, or get an instant due diligence report from PermitNow.io.
Sheridan Building Permit Costs
Permit fees in Sheridan vary based on project type and valuation.
Commercial
- Tenant improvements: $500 to $5,000+
- New commercial construction: $2,000 to $25,000+ (based on valuation)
- Plan review fee: typically 50-65% of the building permit fee
Residential
- Small projects (decks, pools, fences): $50 to $300
- Home additions and remodels: $200 to $2,000+
- New home construction: $1,000 to $10,000+ (based on valuation)
For a detailed permit cost breakdown specific to your project, get a free due diligence report from PermitNow.io.
Trade Permits
- Electrical: $50 to $500
- Plumbing: $50 to $500
- Mechanical: $50 to $500
Fee ranges are estimates. Actual fees depend on project valuation and scope. Contact the Sheridan building department or Permit Place for exact costs.
Sheridan Building Department
Sheridan Building Department
- Website: www.sheridanwy.gov/government/building
- City Website: www.sheridanwy.gov
Frequently Asked Questions About Sheridan Building Permits
How long does it take to get a building permit in Sheridan?
Plan review in Sheridan, WY takes varies by project type for the initial review cycle. Projects that receive correction comments will need additional review cycles, each adding time to the total. Most commercial projects go through at least two review cycles before approval.
What is the difference between residential and commercial permit review in Sheridan?
Commercial projects in Sheridan require review by multiple departments (building, fire, public works, and sometimes health), which adds time. Residential projects typically involve fewer review disciplines and can be processed faster. Tenant improvements fall between the two depending on scope.
Can I speed up the permit process in Sheridan?
The most effective way to speed up the permit process in Sheridan is to submit complete, code-compliant plans on the first attempt. This reduces correction cycles, which are the primary cause of delays. Permit Place helps ensure your application is complete before submission.
Do I need a permit for a tenant improvement in Sheridan?
Yes. Most interior buildouts in Sheridan that involve structural changes, electrical work, plumbing, or HVAC modifications require a building permit. Simple cosmetic changes (paint, flooring, non-structural work) typically do not require a permit.
How much does a building permit cost in Sheridan?
Permit fees in Sheridan are calculated based on project valuation and type. Commercial projects typically pay $500 to $25,000+ in total permit and plan review fees. The exact cost depends on project scope, square footage, and any additional trade permits required.
Can a permit expediter help with my Sheridan project?
Yes. Permit Place expedites building permits in Sheridan and 600+ other jurisdictions. We handle everything from application preparation through plan review, corrections, and permit issuance. Our clients typically get permits faster because we submit complete applications that reduce correction cycles.
What building permits do I need in Sheridan, WY?
Most construction in Sheridan requires a building permit. This includes new construction, tenant improvements, change of use, additions, and major renovations. Separate trade permits for electrical, plumbing, mechanical, and fire protection are also typically required. For a project-specific permit requirements report, use PermitNow.io.
Permit Review Times in Other Wyoming Cities
Need Help With Sheridan Building Permits?
Permit Place has helped hundreds of businesses get permits in Sheridan and across Wyoming. We handle everything from application to approval so you can focus on building.
Request a Free Quote
Free DD Report
Want to know exactly what permits your project needs? Get an instant due diligence report from PermitNow.io. View a free demo DD report