A Guide to Permitting for Multi-State Construction Projects

Expecting your internal team to be experts on the local ordinances of every city and county in the country is unrealistic. What works in one jurisdiction is often irrelevant in the next, and this knowledge gap is a major source of risk for any national rollout. Successfully managing permitting for multi-state construction projects requires deep local intelligence—an understanding of the specific processes, preferences, and people within each municipal office. Without it, you’re essentially guessing. This article breaks down the key differences you’ll encounter and provides a framework for developing the local expertise needed to keep your projects moving forward smoothly.

Key Takeaways

  • Treat Each Location as a Unique Project: A one-size-fits-all approach guarantees delays. Invest in upfront due diligence for every site to master local building codes and AHJ requirements, creating a compliant submittal package that avoids common rejection triggers.
  • Establish a Single Source of Truth: Ditch the spreadsheets and email chains. A centralized portal for all documents, deadlines, and communications gives your entire team real-time visibility, prevents version control errors, and keeps everyone aligned on project status.
  • Focus Your Team on High-Value Work: The administrative grind of permitting can bog down your internal experts. Partnering with a nationwide permit expediter outsources the specialized legwork, freeing your team to manage project timelines, vendors, and budgets.

What to Expect with Multi-State Construction Permits

When you’re managing a multi-state rollout, you can’t apply a one-size-fits-all approach to permitting. Every jurisdiction has its own set of rules, processes, and timelines that can make or break your project schedule. Getting ahead of these differences is the key to keeping your openings on track and avoiding the kind of last-minute surprises that stall revenue.

The core challenge is variability. What gets you an approval in Texas might lead to an immediate rejection in California. From building codes and zoning laws to environmental checks and the specific forms required, each location demands its own strategy. Ignoring these local nuances is a recipe for endless resubmittals and blown timelines, turning what should be a straightforward project into a logistical nightmare. This isn’t just about paperwork; it’s about understanding the unique political and administrative landscape of every city and county you build in. Successfully managing a national rollout means becoming an expert in dozens of different local systems or finding a partner who already is. Before you can even think about breaking ground, you need a clear picture of what each municipality expects. Let’s break down the main areas where you’ll see these differences play out.

What Permits Will You Need?

The first thing to accept is that there’s no universal permit checklist. The types of permits you need will change dramatically from one city to the next, even within the same state. A simple interior remodel in one county might only require a basic building permit, while the same scope of work in a neighboring city could trigger additional electrical, plumbing, and mechanical permits. This complexity grows when you’re managing projects across state lines. Each jurisdiction has its own way of defining and categorizing work, which directly impacts your application package. That’s why upfront due diligence for every single location is non-negotiable. You have to confirm the exact requirements with the local authorities before you even think about submitting.

Decoding State-Specific Building Codes

While many states and cities adopt model codes from the International Code Council (ICC), they almost always modify them with local amendments. This means the code you followed for a project in Florida could have different structural, fire safety, or accessibility requirements than the one you’re using in Colorado. Some states don’t even have a statewide building code, leaving it entirely up to individual counties and municipalities to set the rules. This makes your initial research even more critical. You must verify the specific, locally enforced building codes and zoning regulations for each address to ensure your plans are compliant from day one. Getting this wrong is one of the fastest ways to get hit with corrections and delays.

Who Has the Final Say: Local vs. State Authorities

So, who actually approves your permit? In most cases, the final decision rests with the local Authority Having Jurisdiction (AHJ)—typically the city or county building department. Even when state-level reviews are required, your project’s fate is usually in the hands of the local plan reviewer and building official. Understanding the local power structure is key. Some jurisdictions have a streamlined process with a single point of contact who coordinates reviews across all departments. Others are more siloed, forcing you to manage separate conversations with planning, public works, and the fire marshal. Building a relationship with the local AHJ and understanding their specific processes can make a huge difference in how smoothly your project moves forward.

Factoring in Environmental Regulations

Don’t forget about environmental regulations, which can add another layer of complexity and time to your project. Depending on the location and scope of work, you may need permits related to stormwater management, air quality, or wildlife protection. Coastal areas, for example, often have strict rules that don’t exist inland. These requirements are often managed by separate local, state, or even federal agencies, like the Environmental Protection Agency (EPA). Identifying potential environmental triggers early in your due diligence process is essential. Waiting to discover that your site is near protected wetlands or requires a special historical review can cause significant and costly delays that throw your entire rollout schedule off course.

Why No Two States Are the Same: Key Permitting Differences

If you’re managing a multi-state rollout, you already know that a successful permit strategy in one state doesn’t guarantee a smooth ride in another. The truth is, the process can change dramatically not just from state to state, but from one city to the next. Getting permits for projects in Austin and Dallas, for example, involves navigating two completely different sets of local rules, despite both being in Texas.

This patchwork of regulations is one of the biggest hurdles for multi-site brands. Each jurisdiction has its own priorities, processes, and paperwork. Without deep local knowledge, your team can spend countless hours figuring out a new system for every single location, putting your timelines and revenue goals at risk. Understanding these key differences is the first step toward building a more predictable, repeatable permitting process for your national program.

How Timelines and Costs Vary

The time and money required to get a permit can swing wildly between jurisdictions. One city might turn around a tenant improvement permit in a few weeks, while another takes months for a similar scope of work. These delays often come from differences in plan review cycles, staffing levels at the permit office, and the sheer volume of applications they handle. Costs are just as variable. Filing fees, review fees, and even the accepted payment methods can differ, making it tough to forecast project budgets accurately. A clear understanding of these local nuances is essential for managing your construction timeline and keeping your rollout on track.

The Paper Trail: Different Documentation Needs

A submittal package that sails through in one county can be rejected in another for missing a single document. The required paperwork is rarely standard across the board. Some jurisdictions may require physical “wet-stamped” plans, while others have moved to fully digital submissions. You might also encounter needs for specific land use affidavits, special engineering reports for soil conditions, or detailed utility plans that aren’t required elsewhere. Creating a truly “complete” application means tailoring your construction documentation to meet the unique checklist of each and every authority having jurisdiction (AHJ). This is where having a meticulous quality control process becomes a game-changer.

How Review Processes Change by Jurisdiction

How your application is reviewed is another major variable. Some municipalities have a streamlined, concurrent review process where multiple departments (like building, zoning, and fire) review your plans at the same time. This is the ideal scenario. However, it’s more common to face a sequential review, where your plans must be approved by one department before they can even be sent to the next. This can create bottlenecks and make it difficult to get a clear status update. Knowing whether you’re dealing with a single point of contact or multiple departmental reviewers helps you manage the process proactively instead of just waiting for comments to come back.

Meeting Diverse Compliance Standards

Local building codes are designed to address specific regional challenges, which is why compliance standards are so different everywhere you go. For instance, building codes in Florida are heavily focused on hurricane resistance, while codes in Colorado have strict requirements for snow loads on roofs. These rules aren’t arbitrary; they reflect deep-seated local priorities related to public safety, environmental protection, and historical preservation. Staying on top of the latest International Building Code (IBC) is a start, but you also have to account for the local amendments that make each jurisdiction’s requirements unique.

Common Roadblocks in Multi-State Permitting

When you’re managing a national rollout, you expect challenges. But the permitting process often throws curveballs that can derail even the most carefully planned projects. From navigating a patchwork of local rules to dealing with unpredictable timelines, the roadblocks are significant. Understanding these common hurdles is the first step to building a strategy that keeps your projects on track and your opening dates secure.

Juggling Multiple Jurisdictions

Managing projects across different states feels like working in different countries. The rules for a tenant improvement in Texas are completely different from those for a new build in California. Each city, county, and state operates with its own set of building codes, zoning ordinances, and submission requirements. This lack of standardization makes it nearly impossible to create a repeatable process. Your team is forced to learn a new system for every location, which slows everything down and opens the door for errors. What works in one jurisdiction won’t work in another, turning every new site into a unique and complex challenge.

Dealing with Unpredictable Approval Times

One of the biggest frustrations in multi-state permitting is the wild variation in approval timelines. A permit in one city might take a few weeks, while a similar project in a major metro area could drag on for months. This unpredictability makes it incredibly difficult to create reliable construction schedules and forecast opening dates. When you can’t predict how long permitting will take, you can’t effectively coordinate contractors, order materials, or plan your launch. These delays have a direct impact on your bottom line, pushing back revenue and complicating your entire project management workflow.

Cutting Through Administrative Red Tape

The administrative burden of managing multiple permits is immense. Each jurisdiction has its own forms, specific documentation needs, and unique online portals. For a team overseeing dozens of projects, this translates into a mountain of paperwork and endless follow-up. Keeping track of different deadlines, responding to reviewer comments, and ensuring every application is perfect is a full-time job. A single missed signature or an incorrectly formatted site plan can lead to a rejection, sending you to the back of the line and causing significant delays that ripple through the entire project.

Staying on Top of Constant Rule Changes

The rules of the game are always changing. Jurisdictions frequently update their building codes, adopt new environmental regulations, or change local ordinances. A process that worked for a project last year might be outdated for a new one in the same city. This means your team can’t rely on past experience alone. Staying current with the latest requirements across every market you operate in requires constant vigilance and research. Without a dedicated effort to track these updates, you risk submitting applications based on old information, leading to guaranteed rejections and preventable delays.

Your Playbook for a Smoother Permitting Process

Managing a multi-state rollout can feel like you’re juggling dozens of different rulebooks at once. But with a solid game plan, you can bring consistency and predictability to the process, even when local requirements change from one city to the next. A proactive strategy is your best defense against the delays and surprise costs that can derail aggressive timelines. It’s about shifting from a reactive stance—putting out fires as they pop up—to a controlled, repeatable system that gets you to your opening date faster.

This playbook breaks down the key phases of the permitting lifecycle into actionable steps. By standardizing your approach to research, documentation, quality control, and follow-up, you create a framework that your team can apply to every project, no matter the location. The goal isn’t to memorize every local ordinance but to build a process that ensures you ask the right questions, prepare the right documents, and manage the review cycle with confidence. This system will help you cut down on resubmittals, shorten your days-to-permit, and keep your entire project portfolio on track.

Do Your Homework: Pre-Application Research

Before your design team even finalizes the blueprints, your permitting strategy should be in motion. The most common source of delays is discovering a critical zoning ordinance or local building code requirement too late in the game. Upfront due diligence is non-negotiable. You need to thoroughly research the specific rules for each project location to understand setbacks, parking requirements, signage restrictions, and other local nuances. This early research helps you spot potential conflicts while there’s still time to adjust the design, saving you from expensive revisions and the frustration of a rejected application. Think of it as creating a project-specific compliance guide before you commit to a final plan.

Get Your Documents Right the First Time

A plan reviewer’s first impression of your project comes from your submittal package. If it’s incomplete, inaccurate, or disorganized, you’re already starting from behind. Since documentation requirements can vary dramatically between jurisdictions, you can’t rely on a one-size-fits-all approach. Start by creating a master checklist of all potential documents—from architectural drawings and structural calculations to energy compliance forms and accessibility reports. Then, for each project, confirm the exact requirements with the local authority and tailor your package accordingly. A clean, complete application shows the reviewer you’re professional and prepared, which can go a long way in building a positive relationship and smoothing the review process.

Implement a QC Process for Submittals

Even the most experienced teams can make simple mistakes—a missing signature, an outdated form, or a mislabeled drawing. These small errors are often the cause of initial rejections that add weeks to your timeline. That’s why a formal quality control (QC) process is so critical. Before any application is submitted, have someone who wasn’t involved in its preparation conduct a final review. This second set of eyes is dedicated to checking for completeness and accuracy against the jurisdiction’s specific checklist. This simple quality assurance step acts as a safety net, catching preventable errors and ensuring your application is ready for a smooth review from day one.

Actively Manage the Review Cycle

Submitting your application is the starting line, not the finish line. Once your package is with the jurisdiction, you need to actively manage its journey through the review process. Don’t just wait for an email. Establish a system for tracking the status of every permit, noting key deadlines, and following up with plan reviewers at regular intervals. Proactive communication helps you stay ahead of potential issues and quickly address any questions or comments that arise. A centralized project tracking system gives your entire team visibility into where each permit stands, preventing things from falling through the cracks and keeping your projects moving forward on schedule.

Prepare for Final Inspections

The final inspection is the last major hurdle before you can open your doors. To ensure it goes smoothly, your preparation should start as soon as you receive comments from the plan review. Meticulously track every required correction and ensure your general contractor has addressed each one on-site. Keep clear documentation showing how each comment was resolved. When the inspector arrives, be prepared with a complete set of approved plans and any related documents. A well-organized and proactive approach demonstrates that you’ve taken the review process seriously, making the final sign-off a straightforward confirmation rather than another round of corrections.

Why Relationships with Local Officials Matter

When you’re managing dozens of projects across the country, it’s easy to see the permitting process as a series of transactions. You submit the application, you wait for a response, you get the permit. But behind every plan review and inspection is a person. Building strong, professional relationships with city officials, plan reviewers, and inspectors can be the difference between a project that sails through approvals and one that gets stuck in a cycle of corrections.

Good connections can help you get clear answers faster and resolve issues before they cause major delays. When an official knows you and your team are professional, organized, and respectful of their process, they’re more likely to be helpful and communicative. This isn’t about finding shortcuts; it’s about building trust. A good rapport means your projects are less likely to get lost in the shuffle, and when problems do arise, you have a foundation of mutual respect to work from. This human element is a critical, often overlooked, part of keeping a national rollout on schedule and protecting your open dates.

How to Work Effectively with Local Officials

The best way to build a positive relationship with local officials is to make their job easier. Start by doing your homework. Before you even think about submitting, thoroughly research the local building codes and zoning rules for each project location. Showing up with a clean, complete, and compliant application package demonstrates your professionalism and respect for their time. When you need to communicate, be clear, concise, and organized. Have your project numbers and specific questions ready. A little preparation goes a long way in showing that you’re a serious partner, which can help you get the clear, timely answers you need to avoid expensive delays.

Learn What Each Jurisdiction Prefers

Permitting rules aren’t just different from state to state; they can change dramatically from one county or city to the next. Getting permits for a multi-site rollout means you have to become an expert in the unique preferences of each jurisdiction. One city might have a state-of-the-art online portal for all submittals, while the town next door might still require three sets of paper plans delivered by hand. Some plan reviewers prefer email, while others will only answer questions over the phone during specific hours. Understanding these small but critical details is key to a smooth process. Taking the time to learn each AHJ’s specific requirements prevents simple mistakes that can lead to weeks of delays.

Build Your Professional Network

For a national brand, building and maintaining strong relationships in every single jurisdiction isn’t practical. Your internal team can’t be everywhere at once. This is where leaning on a professional network becomes essential. A nationwide permit expediter already has established connections with municipal staff across the country. They’ve spent years working with these departments and understand the people, processes, and political dynamics at play. By engaging a partner, you’re not just outsourcing the paperwork; you’re gaining immediate access to a network of trusted relationships. This can help you get ahead of potential issues and keep your projects moving forward without the steep learning curve of starting from scratch in a new city.

Master Proactive Communication

Clear and consistent communication is the foundation of any good relationship, and it’s especially important when dealing with permit departments. Instead of waiting for an approval to be granted or denied, actively manage the process with proactive updates. Use a centralized tracking system to monitor all your applications, deadlines, and communications in one place. This ensures nothing falls through the cracks and allows you to provide timely information to both the jurisdiction and your internal stakeholders. When a plan reviewer has a question, a prompt and thorough response shows you’re engaged and committed to the project. This level of organization builds confidence and helps keep your entire portfolio of projects on schedule.

How to Streamline Your Multi-State Permit Strategy

Managing a national rollout with dozens of active permits can feel like a high-stakes juggling act. With different rules, timelines, and contacts in every jurisdiction, it’s easy for things to fall through the cracks, putting your opening dates at risk. But a chaotic process isn’t inevitable. By implementing a clear strategy, you can bring order and predictability to your multi-state permitting. A streamlined approach moves you from a reactive stance—putting out fires as they pop up—to a proactive one where you control the timeline. It’s about creating a repeatable system that ensures every submittal is clean, every deadline is tracked, and every team member is on the same page, no matter how many states you’re building in. This system becomes your playbook for getting approvals faster and pulling revenue forward.

Create a Single Source of Truth

When your project portfolio spans multiple states, relying on spreadsheets, email chains, and shared drives to track permits is a recipe for delays. Information gets siloed, documents become outdated, and accountability blurs. The first step to streamlining your process is to establish a single source of truth—a centralized hub where all permit-related information lives. This system should house everything from initial due diligence reports and application drafts to AHJ comments and final approvals. Centralizing this data makes it easier to manage construction documents and gives your team one place to find what they need, reducing administrative drag and ensuring everyone is working with the most current information.

Use a Portal for Real-Time Tracking

A static database isn’t enough; you need dynamic, real-time visibility into every project. A dedicated permit management portal allows you to track the status of all applications, deadlines, and updates across your entire portfolio at a glance. Instead of manually chasing down updates from different team members or jurisdictions, you can see exactly where each permit stands in the review cycle. This level of transparency is critical for multi-site rollouts, as it helps you monitor project progress and identify potential bottlenecks before they derail your schedule. With real-time tracking, you can manage by exception, focusing your attention on the projects that need it most while letting your system keep everything else on track.

Keep Your Team Aligned

A successful multi-state rollout depends on seamless collaboration between your internal team, architects, engineers, and general contractors. A centralized portal acts as the connective tissue, keeping every stakeholder aligned and informed. When everyone can access the latest permit information, version control issues disappear, and critical feedback from an AHJ doesn’t get lost in an email inbox. This shared visibility ensures that your entire project team is operating from the same playbook. It clarifies responsibilities, streamlines communication, and creates a clear audit trail, which is essential for maintaining momentum and accountability across dozens of concurrent projects.

Identify and Manage Risks Early

The most expensive permit delays often stem from issues that could have been caught upfront. A proactive strategy involves building in a thorough due diligence phase to identify and mitigate risks before you ever submit an application. This means digging into local building codes, zoning ordinances, and unique jurisdictional requirements for each project location ahead of time. By understanding the specific challenges of a municipality—whether it’s a lengthy planning review process or specific environmental regulations—you can prepare a more complete and accurate submittal package. This proactive risk management drastically reduces the likelihood of corrections and resubmittals, helping you avoid costly delays and keep your projects on schedule.

Essential Tools and Resources for Your Team

Managing a multi-state rollout means your team is juggling dozens of timelines, hundreds of documents, and countless jurisdictional quirks. Without the right systems in place, it’s easy for critical details to fall through the cracks, putting your open dates and revenue at risk. The constant back-and-forth with different AHJs, tracking down the latest plan sets, and giving status updates to leadership can feel like a full-time job in itself. This is where having a dedicated toolkit becomes non-negotiable, moving your team from a reactive stance to a proactive one.

Equipping your team with the right tools isn’t just about efficiency; it’s about creating a predictable, repeatable process that protects your bottom line. When you can see your entire permit pipeline in one place, you can make smarter decisions about resource allocation and risk management. From centralized software that provides a single source of truth to specialized partners who can handle the legwork in unfamiliar cities, the right resources transform a chaotic process into a well-oiled machine. They give you the visibility and control you need to manage your entire portfolio with confidence, spot potential roadblocks early, and keep every project moving forward on schedule.

The Right Project Management Software

When you’re coordinating projects across different states, a standard spreadsheet won’t cut it. You need a single source of truth. Using dedicated building permit software can make managing permits across multiple locations much easier by centralizing all your project data. This helps reduce administrative work, improves communication between your internal team, architects, and contractors, and allows you to set more accurate and reliable project timelines. Instead of chasing down status updates via email and phone calls, your team can see exactly where every application stands in real time, helping you spot potential delays before they become serious problems.

Systems for Organizing Documents

A single permit application can involve a mountain of paperwork, from architectural drawings to engineering reports. Now multiply that by 20 or more projects. A disorganized system is a recipe for resubmittals. A centralized document management system acts as a hub where everyone involved can access the latest permit information. This is crucial for managing different versions of documents and ensuring your general contractor is building from the most recently approved plans. It keeps your project timelines clear and prevents the costly, time-consuming errors that happen when a team member accidentally submits an outdated file to the jurisdiction.

When to Bring in a Permit Expediter

Sometimes, the most effective tool is an expert partner. If your team is stretched thin or entering unfamiliar territories, hiring a nationwide permit expediter can be a game-changer. These specialists live and breathe local codes and processes. They already know the rules in different cities and have established relationships with the officials who review your plans. This insider knowledge helps them prepare clean, complete submittal packages that meet each jurisdiction’s specific requirements. An expediter can make the entire process smoother and faster, acting as a dedicated advocate to keep your applications moving forward.

Tools for Monitoring Compliance

For a high-level view of your entire rollout, you need a robust tracking system. This goes beyond simple project management; it’s about portfolio-wide compliance and risk management. A comprehensive tracking tool allows you to monitor all your permit applications, deadlines, and status updates for every project at once. This ensures nothing gets missed and that every project stays on schedule. With real-time visibility into your entire pipeline, you can proactively manage timelines, allocate resources more effectively, and provide clear, accurate updates to leadership without having to manually compile reports from a dozen different sources.

Build an Efficient, Repeatable Permitting Process

When you’re managing a multi-state rollout, you can’t afford to reinvent the wheel for every single location. The key to predictable openings and on-time revenue is building a system—a well-oiled machine that turns complex, varied requirements into a straightforward, repeatable process. This isn’t about finding a magic bullet for every jurisdiction; it’s about creating a strong internal framework that brings consistency and control to an otherwise chaotic part of the development cycle.

By systemizing your approach, you move from a reactive stance—fighting fires as they pop up—to a proactive one where you anticipate challenges and have a clear plan to address them. This means fewer surprises, less time wasted on administrative churn, and a clear path to getting your doors open. A repeatable process gives your team the structure it needs to execute flawlessly, whether you’re opening one new site or one hundred.

Standardize Your Application Packages

Think of your permit application as a kit of parts. Instead of starting from scratch for every project, you should build a master application package that contains every document you could possibly need. This includes standard architectural drawings, engineering specs, corporate information, and any other common requirements. This becomes your comprehensive starting point. When you begin a project in a new jurisdiction, you simply pull from this master kit and tailor it to the specific local rules. This approach ensures you never miss a standard item and allows your team to focus their energy on navigating the unique nuances of that particular city or county. Creating a standardized submittal package is the first step toward reducing errors and cutting down on the back-and-forth that leads to costly resubmittals and delays.

Allocate Your Resources Strategically

Let’s be honest: your internal team can’t be experts in the permitting codes of every single municipality across the country. Expecting them to be is not only unrealistic but also an inefficient use of their time and your budget. The administrative burden of tracking different rules, forms, and deadlines for dozens of projects is immense and often falls outside your team’s core competencies. Take a hard look at where your team is spending its time. If they’re bogged down in paperwork and chasing down plan reviewers, they aren’t focused on higher-value activities that drive your projects forward. Strategically allocating resources might mean bringing in an external partner to handle the specialized, time-consuming work of permit expediting. This frees up your internal experts to manage project timelines, vendors, and budgets—the work they were hired to do.

Set Up Clear Progress Monitoring

For a multi-site program, spreadsheets and email chains are where visibility goes to die. You need a single source of truth to effectively manage your entire permit portfolio. A centralized tracking system gives everyone on your team—from project managers to leadership—real-time insight into the status of every application, deadline, and AHJ update. This system should be more than a simple checklist. It needs to house all your documents, log all communications with officials, and track key milestones. When you have a clear, accessible overview of all your projects, you can spot potential bottlenecks before they derail your schedule. This level of progress monitoring ensures nothing falls through the cracks and keeps your entire rollout on schedule.

Take Control of Your Timelines

While you can’t force a plan reviewer to approve your application faster, you can control every single step leading up to that review. Unpredictable approval times are a major source of project delays, but you can introduce predictability by focusing on what’s within your power. Start by researching and documenting the typical review timelines for each jurisdiction you operate in and build those realistic estimates into your project schedules. The single most effective way to manage your timeline is to submit a clean, complete, and accurate application package on the first try. Every correction letter or request for information adds weeks, if not months, to your schedule. By investing in a rigorous quality control process before you submit, you minimize the risk of resubmittals and take control of your project timeline. This proactive approach is fundamental to ensuring your sites open on time and start generating revenue as planned.

Related Articles

Frequently Asked Questions

What’s the single biggest mistake teams make with multi-state permitting? The most common pitfall is treating permitting as a simple administrative task instead of a critical project phase. Teams often jump straight into design without doing the upfront due diligence on local codes and zoning rules. This leads to submitting plans that are non-compliant from the start, guaranteeing a cycle of rejections and revisions that can add months to a timeline. A little research on the front end prevents a lot of expensive rework later.

You mentioned a permit expediter. What do they actually do besides submit paperwork? A good permit expediter does much more than just drop off plans. They act as your project’s advocate and local expert. They handle the initial due diligence, perform a quality check on your application to catch errors before the city does, and manage all communication with plan reviewers. Because they have existing relationships and understand the specific processes of each jurisdiction, they can often resolve issues and get clear answers much faster than a team that’s new to the area.

How can my team realistically do deep research for every single location when we’re already stretched thin? That’s a very real constraint, and the answer is strategic allocation. You don’t have to become an expert in every city code. The key is to build a system. Start by creating a master checklist for your due diligence process. For high-priority or particularly complex jurisdictions, it often makes more sense to bring in a specialized partner to handle that research. This frees up your internal team to focus on managing the overall project schedule and budget, which is a much better use of their expertise.

Building relationships with local officials sounds good, but how is that practical for a national rollout? You’re right, your project manager can’t be expected to have a personal connection in every city. The relationship isn’t about being friends; it’s about being professional and predictable. You build a good reputation by consistently submitting clean, complete applications that make the reviewer’s job easier. For true local insight, this is where a permit expediting partner becomes invaluable. They have spent years building those ground-level relationships, and you can leverage their network to your project’s advantage.

We use spreadsheets to track our permits now. What’s the real benefit of a dedicated portal? While spreadsheets can work for a few projects, they quickly become a liability in a multi-state program. The real benefit of a portal is creating a single source of truth that provides real-time visibility for everyone. It eliminates version control issues with documents, prevents critical AHJ comments from getting lost in an email chain, and gives leadership a clear dashboard view of the entire portfolio. This saves your team from the constant administrative churn of chasing updates and allows you to spot potential delays before they become critical problems.