Managing a national rollout means every new location is a new puzzle. Different cities have different rules, different forms, and different timelines. What worked in one state can get your application kicked back in another, creating a ripple effect of delays that stalls construction and pushes back opening dates. This is where you move from managing a project to just fighting fires. The key to breaking this cycle is doing the homework upfront. This guide breaks down the essential steps of permit due diligence, showing you how to uncover every requirement and potential roadblock before they derail your project. Using professional permit due diligence services transforms this chaotic process into a predictable, repeatable system for success.
Key Takeaways
- Front-load your research to protect your timeline: Due diligence isn’t an extra step; it’s the foundational work that uncovers zoning, code, and site issues early, preventing the costly delays that push back opening dates and revenue.
- Standardize your process for predictable results: Create a non-negotiable checklist and a rigorous quality control review for every project. This ensures every application is clean and complete, dramatically reducing the risk of resubmittals.
- Use a centralized system for multi-site rollouts: Juggling different rules across dozens of cities is a recipe for delays. A single partner or platform provides one source of truth, ensuring consistency and real-time visibility across your entire portfolio.
What is Permit Due Diligence?
Think of permit due diligence as the essential homework you do before a big project kicks off. It’s the deep research phase that happens at the very beginning, long before you submit any applications. The goal is simple but critical: to uncover every requirement, rule, and potential roadblock for your specific project and location. For multi-site rollouts, this isn’t just a best practice—it’s your first line of defense against the delays and budget overruns that can derail an entire program.
Proper due diligence means you walk into the permitting process with a clear roadmap. You’ll know which jurisdictions you’re dealing with, what they expect from you, and how long it’s likely to take. Instead of reacting to unforeseen issues and surprise requests from plan reviewers, you can proactively address them. This initial investment of time and resources is what separates a smooth, predictable project from one plagued by constant back-and-forth with the city. It’s about replacing uncertainty with a clear, actionable strategy that gets your doors open on schedule.
Breaking Down the Process
So, what does this research actually involve? It starts with identifying the correct Authority Having Jurisdiction (AHJ)—the specific local government agency that enforces building codes for your project’s location. For a national rollout, this alone can be a complex task, as requirements can vary dramatically from one city to the next. The process then involves a deep dive into the property’s history and the jurisdiction’s specific regulations. This includes uncovering all necessary legal documents, identifying every government department that needs to review your plans, and understanding the local building codes and ordinances that apply to your project.
Key Components and What You Get
A thorough due diligence investigation identifies every single permit your project will need—from the main building permit to separate electrical, plumbing, mechanical, and fire safety permits. For each one, you’ll get a detailed list of the required documents, forms, and associated fees. The final deliverable is typically a clear, organized report that serves as your project’s permitting playbook. This report outlines the entire process from start to finish, provides a realistic timeline for approval, and flags any potential red flags. This allows you to plan solutions early and keep your project moving forward without costly surprises.
How a Permit Partner Helps
Trying to manage due diligence for dozens of locations across different states is a massive undertaking. Each municipality has its own unique processes, unwritten rules, and relationships. This is where an experienced permit partner becomes invaluable. A national permit expediter has the expertise and local connections to conduct thorough and effective due diligence everywhere you build. They understand the nuances of different jurisdictions and can often anticipate issues before they arise. By handing off this critical research, you get a reliable, centralized process that ensures every project in your rollout is set up for a smooth and predictable permit approval.
The 5 Must-Haves in Your Due Diligence Checklist
A solid due diligence checklist is your project’s first line of defense against costly surprises. It’s about more than just ticking boxes; it’s about systematically uncovering potential roadblocks before they become full-blown crises that derail your timeline and budget. For multi-site rollouts, where you’re juggling dozens of jurisdictions at once, a standardized checklist is non-negotiable. It ensures every site is vetted against the same critical criteria, giving you the confidence to move forward without second-guessing. Think of these five items as the foundational pillars of any pre-construction investigation.
Getting them right from the start saves you from the kind of back-and-forth with authorities that grinds projects to a halt. It’s the difference between a smooth launch and a series of preventable headaches. This isn’t just about avoiding fines; it’s about protecting your revenue timeline. Every day a permit is delayed because of a missed detail is a day your new location isn’t open for business. By front-loading this investigative work, you create a clear path for your architects, engineers, and general contractors, ensuring everyone is working with accurate information. This proactive approach is what separates predictable, on-time rollouts from chaotic, budget-breaking ones.
Zoning and Land Use Analysis
Before you get attached to a site, you need to confirm you can actually build what you want to build there. This step involves a deep dive into local zoning laws and land use regulations to ensure your project’s intended purpose is permitted. Is the property zoned for commercial use? Are there specific restrictions on building height, setbacks, or even the type of business you can operate? Answering these questions upfront is crucial for avoiding legal headaches and ensuring the fundamental legality of your project. Getting this wrong can lead to forced redesigns or, in the worst-case scenario, a complete halt to your plans.
Building Code Compliance Review
Once you’ve confirmed the what, you need to figure out the how. Every municipality has its own set of rules, and local building codes can vary dramatically from one city to the next. This review ensures your architectural and engineering plans adhere to all requirements for structural integrity, fire safety, accessibility, and energy efficiency. Starting this process early allows your design team to select the right materials and methods from the get-go, preventing the need for expensive revisions later. A thorough code review is essential for a clean submittal that sails through the plan check process without endless corrections.
Environmental Site Requirements
What lies beneath the surface can have a massive impact on your project. An environmental site assessment is vital for identifying potential contamination, hazardous materials, or other environmental problems from previous land use. Issues like soil contamination or protected wetlands can introduce significant cleanup costs and project delays. This check protects you from unforeseen liabilities and ensures your project complies with federal, state, and local environmental regulations. It’s a critical step in understanding the true condition of a property and the potential risks associated with developing it.
Historical Property Checks
A property’s past can hold important clues about its future. Digging into a site’s history can uncover restrictions, easements, or covenants that might affect your development plans. This investigation looks into the property’s past records, including previous permits, historical designations, and any legal documents tied to the land. For example, a historical preservation status could severely limit your ability to alter an existing structure. Understanding this context early on helps you anticipate potential hurdles and design a project that respects any existing obligations or limitations, preventing conflicts with preservation societies or local authorities.
Utility and Infrastructure Assessment
Your beautiful new building won’t be much good without power, water, and sewer access. This assessment evaluates whether the existing utilities and infrastructure can support your proposed development. Can the local water main handle the demand of a new restaurant? Is the electrical grid sufficient for your planned equipment? Are there sewer connection points readily available? Identifying any shortfalls here is critical for budgeting, as utility upgrades can be incredibly expensive and time-consuming. This practical check ensures your site is not only legally viable but also functionally ready for construction and operation.
Why Professional Due Diligence Is a Smart Investment
When you’re managing a multi-site rollout, every decision is magnified. A small misstep on one project can create a ripple effect that disrupts timelines and budgets across your entire portfolio. This is where professional due diligence becomes less of a line item and more of a strategic advantage. Think of it as the foundational work that ensures your project starts on solid ground, preventing costly surprises from emerging weeks or months down the road.
Investing in a thorough due diligence process means you’re choosing predictability over uncertainty. Instead of reacting to problems as they appear, you’re proactively identifying and solving them before they can cause delays. It’s about understanding the full picture of a site—from zoning quirks and obscure building codes to environmental regulations and utility access—so you can build accurate budgets and realistic timelines. For development and construction leaders tasked with delivering dozens of projects on schedule, this foresight is invaluable. It’s the difference between constantly fighting fires and executing a smooth, successful national rollout.
Mitigate Risk and Prevent Delays
Every construction project comes with inherent risks, but a national rollout multiplies them across every new jurisdiction you enter. Professional due diligence is your first line of defense. The process is designed to uncover potential roadblocks—like unexpected zoning restrictions, historical preservation requirements, or local ordinances—long before you break ground. By identifying these issues early, you can mitigate risks and avoid the costly delays that come from last-minute plan changes or rejected permit applications. This proactive approach turns uncertainty into a clear, actionable plan, preventing a single site’s problem from jeopardizing your entire program’s schedule.
Protect Your Budget and See the ROI
Nothing strains a project budget like unforeseen expenses. A thorough due diligence investigation acts as a financial safeguard, confirming the facts and feasibility of your project before you commit significant capital. This review identifies hidden costs, such as impact fees, utility connection charges, or required site improvements, allowing you to create a more accurate and reliable budget from the start. While it is an upfront cost, the return on investment is clear. By preventing expensive change orders, redesigns, and repeated submission fees, you protect your budget from the costly surprises that can derail a project’s financial viability.
Keep Your Project Timeline on Track
For multi-site brands, time is money. Delays don’t just push back opening dates; they postpone revenue. Starting the due diligence process early is key to keeping your project on schedule. It allows your team to work with architects and engineers to confirm that all plans and materials meet local requirements before the initial submission. This front-end work ensures your application package is clean and complete, dramatically reducing the chances of it being rejected. By avoiding the endless back-and-forth with planning departments, you can keep your project timeline on track and move smoothly from submission to approval.
Ensure Full Compliance from Day One
Navigating the web of regulations across different cities and states is one of the biggest challenges in a national rollout. Due diligence ensures you meet every requirement from the outset. This goes beyond standard building codes to include local zoning laws, environmental regulations, accessibility standards, and more. A comprehensive due diligence process involves a methodical assessment of all relevant documents and rules for a specific site. This ensures your project is fully compliant from day one, helping you avoid stop-work orders, fines, or the need for expensive retrofits after construction is already underway.
Set Your Project Up for Success
Ultimately, professional due diligence provides the clarity and direction needed to execute a successful project. A detailed report gives you clear answers to critical questions about costs, timelines, and potential challenges you’ll face at a specific location. This information empowers you to make smarter, more informed decisions throughout the project lifecycle. Instead of guessing, you’re operating with a complete understanding of what’s required to get your permit approved. By building your project on this foundation of knowledge, you transform a complex process into a predictable one and set your project up for success from the very beginning.
Solving Multi-Jurisdiction Headaches
When you’re managing a multi-site rollout, the permitting process can feel like you’re starting from scratch with every new location. What gets you a quick approval in Austin might get your application rejected in Boston. Each city, county, and state—often called the Authority Having Jurisdiction (AHJ)—has its own unique set of codes, submission requirements, and review timelines. For construction and development leaders overseeing dozens of projects, this patchwork of regulations creates a massive logistical challenge. Keeping track of every variable is more than a full-time job; it’s a barrier to opening on time and generating revenue.
This is where the real value of a national permit partner comes into play. Instead of your team spending countless hours learning the nuances of every local office, a partner acts as your single point of contact. They bring a deep understanding of these jurisdictional differences and have established processes for managing them efficiently. This centralized approach turns a chaotic, unpredictable part of your project into a streamlined and repeatable system. It’s about replacing guesswork with a proven strategy, ensuring that every application package is clean, complete, and tailored to the specific AHJ it’s heading to.
Handling Regulatory Variations
The biggest hurdle in multi-jurisdiction permitting is the sheer variety of local rules. Zoning ordinances, building codes, and specific amendments can differ dramatically from one town to the next. For example, one city might have strict historical preservation guidelines, while another has specific requirements for stormwater management. A permit partner’s first job is to perform thorough due diligence to uncover these local rules before an application is ever submitted. This proactive research involves a deep dive into the municipal codes and direct communication with planning officials to confirm requirements, preventing simple misunderstandings that could derail your timeline.
Meeting Local Documentation Requirements
It’s not just the rules that change—it’s the paperwork, too. One jurisdiction might require digital submissions through a specific online portal, while another insists on three sets of wet-stamped paper plans. The formatting, required forms, and supporting documents are rarely standard across the board. Even a small mistake, like a missing signature or an incorrectly formatted site plan, can lead to an immediate rejection and force you back to the starting line. A partner specializing in permit expediting implements a rigorous quality control check to ensure every package meets the exact documentation standards of the local AHJ, dramatically reducing the risk of resubmittals.
Coordinating Across Different Cities and States
For a national brand, managing 20, 50, or 100+ active projects means juggling dozens of different AHJ contacts, review cycles, and deadlines. Your internal team can’t possibly become an expert on every municipality. This is where coordination becomes critical. A centralized permit partner handles all communication and follow-up across every single one of your projects. They know who to call, when to follow up, and how to get clear answers from plan reviewers. This frees your team to focus on the bigger picture of your rollout instead of getting bogged down in the administrative details of each individual permit.
Implementing Quality Control Systems
The secret to faster approvals is submitting a clean, complete application package the first time. A professional permit partner builds their entire process around quality control. Before any documents are sent to a city or county, they undergo a meticulous internal review. This audit confirms that all plans are accurate, all forms are filled out correctly, and all supporting materials are included. This system catches potential red flags early, allowing you to make corrections before a plan reviewer ever sees them. It’s a proactive approach that transforms the submittal process from a gamble into a predictable step forward.
Tracking Progress in One Place
When you have projects scattered across the country, trying to get a simple status update can be a frustrating game of phone tag and email chains. A key part of solving multi-jurisdiction headaches is having a single source of truth. Modern permit partners provide a centralized online portal where you can see the real-time status of every permit in your pipeline. You can access documents, track key dates, and see exactly where each project stands without having to chase down information. This level of project visibility gives you the data you need to make informed decisions and keep stakeholders updated with confidence.
Your Due Diligence Roadmap: A Step-by-Step Guide
A successful multi-site rollout doesn’t happen by accident. It’s the result of a clear, repeatable process that catches issues before they become expensive delays. Think of due diligence as your project’s playbook. It’s a systematic approach to gathering intelligence, preparing your materials, and engaging with local authorities. When you have a solid roadmap, you can anticipate challenges, prevent unnecessary resubmittals, and keep your timeline intact across every single location.
Following a structured plan is the key to transforming permitting from a chaotic variable into a predictable part of your development cycle. Whether your team handles this in-house or you work with a dedicated partner, these five steps are essential for getting it right. They ensure nothing falls through the cracks, from initial site research to the final follow-up with city officials. This roadmap will help you build a foundation for faster approvals and smoother project execution.
Step 1: Initial Research and Site Assessment
This is your intelligence-gathering phase. Before a single form is filled out, you need to understand the specific landscape of your project site. This initial research is a deep dive into the local jurisdiction’s rules, regulations, and requirements. The goal is to uncover all the critical information you need, including zoning ordinances, land use restrictions, and any potential red flags unique to that city or county. For brands expanding across the country, this is where a partner with nationwide coverage provides immense value, bringing established knowledge of local codes and processes to the table from day one.
Step 2: Preparing Key Documents
Once you know the rules of the game, it’s time to assemble your application package. This step goes beyond just architectural drawings. It involves identifying and gathering every single document required by each reviewing department—from the building and fire departments to health and public works. You’ll need to find the necessary legal papers, confirm submission formats, and understand the local building codes inside and out. Getting this step right is all about meticulous organization. A complete and accurate document set is your first line of defense against an immediate rejection or a lengthy correction cycle.
Step 3: Internal Application Review
Think of this as your final quality control check before going live. Before any package is submitted to the jurisdiction, it needs a thorough internal review from an expert eye. This is the moment to work closely with your architects and engineers, ensuring all plans and supporting materials meet the required standards. This pre-submission audit is designed to catch errors, inconsistencies, or missing information before a city plan reviewer does. A permit partner acts as that critical second look, ensuring you submit a clean, complete package that is primed for a smoother, faster review process.
Step 4: Managing the Submission
With a polished application in hand, it’s time for submission. This isn’t just a simple drop-off; it’s a strategic action that requires precision. This step involves identifying all the different permits required for your project—such as building, electrical, plumbing, and fire—and submitting them to the correct departments with the right forms and fees. For a complex commercial project, this can mean coordinating multiple applications simultaneously. Ensuring every component is delivered to the right place in the right format is crucial for avoiding the administrative kickbacks that can stall a project before it even begins.
Step 5: Following Up with Authorities
Your job isn’t done once the application is submitted. Proactive and professional follow-up is key to keeping your project moving forward. This final step involves maintaining open lines of communication with the plan reviewers and other city officials. It’s about checking in on your project’s status, promptly answering any questions that arise, and providing any requested clarifications. This isn’t about being a pest; it’s about being a helpful and responsive partner to the jurisdiction. An experienced expeditor knows who to contact and how to communicate effectively, often finding ways to streamline the review process and prevent your project from getting lost in the shuffle.
How to Streamline Your Multi-Site Rollout
Managing a multi-site rollout feels like conducting an orchestra where every musician is in a different time zone and reading from different sheet music. The complexity multiplies with every new city and state, each with its own set of rules and timelines. Success isn’t about managing each project individually; it’s about creating a repeatable, predictable system that works everywhere. Without a solid strategy, you’re left dealing with inconsistent submittals, missed deadlines, and a portfolio of projects that are constantly at risk of falling behind schedule.
A streamlined process cuts down on surprises, keeps your timelines intact, and ensures your teams aren’t constantly putting out fires. The key is to build a playbook that brings consistency and clarity to every stage of the permitting process, from initial due diligence to final approval. This means moving beyond ad-hoc solutions and implementing a strategy that scales with your growth. By focusing on centralization, standardization, and communication, you can turn a chaotic rollout into a well-oiled machine that delivers stores on time and on budget. Here are five strategies to make that happen.
Adopt a Centralized Management Approach
When you’re juggling dozens of projects, a decentralized approach where local teams or contractors handle their own permitting is a recipe for inconsistency and risk. One of the biggest hurdles for multi-unit businesses is ensuring consistency across all locations, and permitting is no exception. A centralized management strategy, whether through a dedicated internal team or a single permit partner, brings order to the chaos.
This approach establishes one point of contact and one standard of quality for every project in your portfolio. Instead of chasing down updates from ten different people, you have a single source of truth. This ensures every application is prepared and submitted with the same level of care, and every jurisdiction is managed with a consistent, professional strategy.
Standardize Your Documentation
Inconsistent or incomplete paperwork is the number one cause of permit delays and rejections. While every jurisdiction has its own unique forms and requirements, your internal process for creating and reviewing documents should be uniform and airtight. When it comes to multi-location operations, one of your highest priorities should be achieving consistency in your core processes.
Create standardized templates, checklists, and a non-negotiable quality control process for every application package before it leaves your hands. This simple step minimizes human error and ensures every submittal is clean, complete, and correct the first time. Standardizing your documentation is the foundation for building a predictable permitting timeline you can actually rely on.
Demand Real-Time Visibility
You can’t manage what you can’t see. Flying blind on permit statuses across 50 different projects makes it impossible to forecast timelines, manage budgets, or give stakeholders accurate updates. Tracking the progress of multiple units is far more complex than managing a single location, and relying on spreadsheets and email chains for updates just won’t cut it.
Demand a single dashboard or portal where you can see the real-time status of every permit at a glance. This central hub should track submission dates, review timelines, comments from plan checkers, and all communication logs. This level of project visibility empowers you to spot potential bottlenecks before they become major delays and keeps everyone on the same page without endless follow-up meetings.
Coordinate Your Timelines
Permitting doesn’t happen in a vacuum. It’s a critical dependency for construction, procurement, marketing, and operations. A two-week delay in receiving a permit can have a domino effect, pushing back your grand opening and stalling revenue. Effective due diligence requires factoring in these industry-specific operational risks from the very beginning.
Map out your entire project timeline and identify key dependencies. Work backward from your target opening date to establish clear deadlines for permit submission and approval, and build in realistic buffers for potential jurisdiction delays. A well-coordinated timeline ensures that your general contractor has the permit in hand exactly when they need it and that all teams are aligned toward a successful launch.
Improve Stakeholder Communication
A multi-site rollout involves a huge cast of characters: architects, engineers, general contractors, internal real estate teams, and your permit partner. If they aren’t communicating effectively, critical information falls through the cracks. The goal is to maintain brand standards in your process while adapting to regional requirements—a balance that hinges on clear communication.
Establish a regular communication cadence, like a weekly status meeting or a shared dashboard, to keep everyone aligned. Clearly define roles and responsibilities so there’s no confusion about who owns what. When all stakeholders have access to the same information and understand the status of each project, you eliminate redundant work and ensure the entire team is moving in the same direction.
Best Practices for Flawless Due Diligence
Getting your due diligence right isn’t about luck; it’s about having a solid, repeatable game plan. When you’re managing dozens of projects across different states, a single oversight can create a domino effect of delays, pushing back opening dates and stalling revenue. The goal is to submit a clean, complete package that sails through the review process, and that starts long before you ever fill out an application. Think of due diligence as the foundational work that sets the tone for your entire project timeline.
Adopting a few key best practices can transform your permitting process from a source of constant headaches into a predictable, streamlined operation. It’s about shifting from a reactive mindset—fixing problems as they pop up—to a proactive one where you anticipate challenges and solve them ahead of time. This means getting organized, communicating clearly with everyone involved, and building quality checks into every step. By treating due diligence with the strategic importance it deserves, you can significantly cut down on resubmittals, keep your rollouts on schedule, and get your doors open faster.
Plan Early and Be Proactive
The single most effective thing you can do is start your due diligence at the very beginning of the project lifecycle. Don’t wait until designs are finalized. Bringing in your permit partner early allows them to work alongside your architects and engineers, ensuring every plan and material specification meets local requirements from day one. This proactive approach catches potential red flags before they become expensive problems, saving you from costly redesigns and submission delays. It’s the difference between steering the ship and just plugging leaks.
Manage Your Documentation
At its core, due diligence is a detailed investigation, and your documentation is the evidence. Every report, survey, and drawing needs to be accurate, complete, and meticulously organized. A common reason for rejection is simply missing or incorrect paperwork. Creating a centralized system for all essential documents is critical for commercial real estate development and ensures your team and partners are all working from the same playbook. Treat document management as a core project function, not an administrative afterthought. This discipline is what leads to clean, approvable submittals.
Coordinate with Local Authorities
Every city, county, and state has its own set of rules, processes, and personalities. A huge part of due diligence is figuring out which local government agency—or jurisdiction—is in charge and what, exactly, they expect to see. Instead of starting from scratch with every new location, a permit partner can leverage their existing relationships and local knowledge to get clear answers quickly. They know who to call, what questions to ask, and how to present your project in a way that meets the specific requirements of that authority having jurisdiction.
Optimize Your Internal Process
A smooth external process depends on a solid internal one. For multi-site rollouts, you need a standardized, repeatable workflow that everyone on your team understands. This includes clear roles and responsibilities, established communication channels, and a centralized platform for tracking progress across your entire portfolio. Conducting thorough due diligence isn’t just about ticking boxes; it’s about creating an efficient system that minimizes risk and can scale as your brand grows. When your internal process is airtight, you can move faster and with more confidence.
Implement Quality Assurance Checks
Before any application package leaves your hands, it needs a final, rigorous quality assurance review. This is your last chance to catch any errors, inconsistencies, or missing information that could trigger a rejection from the plan reviewer. This check should be performed by someone with a deep understanding of the jurisdiction’s requirements, ensuring every detail aligns with local codes and ordinances. Implementing this final review step is a simple but powerful way to reduce the risk of resubmittals and keep your project timeline intact.
Related Articles
- What is Permit Due Diligence? A Complete Guide
- How to Master Permitting for Multi-State Construction Projects
- How to Master Permitting for Multi-State Construction Projects
Frequently Asked Questions
When is the right time to start the due diligence process? You should start the due diligence process as early as possible, ideally during the site selection phase before you’ve even signed a lease. Think of it as part of your initial project feasibility study, not just a step before you submit permits. Kicking off this research early allows you to identify any potential deal-breakers—like major zoning conflicts or utility limitations—before you’ve committed significant resources to a location. It also gives your design team the information they need to create plans that align with local codes from the very beginning.
My architects and general contractors are local to each project. Isn’t their knowledge enough for due diligence? While your local architects and GCs are experts in building and design, permit due diligence is a very specific kind of investigative work that focuses on administrative code and jurisdictional processes. A dedicated permit partner specializes in understanding the unwritten rules, relationships, and submission requirements of planning departments across the country. For a multi-site brand, this provides a consistent standard of research at every location, ensuring nothing is missed, rather than relying on the varied experience of different local teams.
How does a thorough due diligence process actually speed up permit approval? It all comes down to submitting a clean, complete application package on the first try. Due diligence is the homework that ensures your submittal is perfectly tailored to what that specific city’s plan reviewer needs to see. When you’ve already identified every required form, fee, and local code amendment, you eliminate the common errors and omissions that trigger a rejection. This helps you avoid the lengthy correction cycles and back-and-forth communication that can add weeks or even months to your timeline.
What’s the biggest mistake you see companies make with due diligence on a national rollout? The most common mistake is taking a decentralized approach, where each project’s permitting process is managed differently. This creates inconsistency and makes it impossible to maintain a predictable timeline across your portfolio. Without a standardized system for vetting sites and preparing applications, the quality of your submissions will vary, leading to surprise delays and budget issues. A successful rollout depends on a centralized strategy that applies the same high standard of review to every single project.
We’re only opening a few new locations this year. Is a full due diligence process still necessary? Yes, absolutely. The principles of good due diligence apply whether you’re opening two locations or two hundred. A permit delay on a single project can still have a significant impact on your revenue goals and construction schedule. By implementing a thorough process now, you’re not only protecting your current projects but also building a solid, repeatable system that will make future growth much smoother and more predictable. It’s about establishing good habits that set your brand up for long-term success.