Memorial City Mall Tenant Improvement Permits: What You Need to Know
By Permit Place | Last updated: February 2026
Tenant improvement permits at Memorial City Mall require approval from MetroNational and submission to the City of Houston Public Works Department. Houston has no zoning code, but commercial TI projects still require building permits. Review times average 10 to 20 business days for standard commercial buildouts.
Memorial City Mall is a regional shopping center with mixed-use expansion in Houston, Texas. The property is owned by MetroNational, a Houston-based real estate developer. If you are planning a tenant improvement at Memorial City Mall, understanding Houston’s permit process is essential.
Houston is unique among major U.S. cities because it has no zoning code. However, commercial TI projects still require full building permits through the City of Houston Public Works Department. Memorial City’s tenant coordination team manages landlord approvals in parallel with city submissions.
About Memorial City Mall
Memorial City Mall is a regional shopping center with mixed-use expansion owned by MetroNational. The property includes traditional enclosed retail, restaurants, and an expanding mixed-use district with residential towers, hotel space, and new retail.
Memorial City is undergoing a multi-phase expansion adding residential towers, hotel space, and new retail. Expect increased permit activity through 2027 as the expansion progresses. This means higher competition for plan review slots and potential delays during peak submission periods.
The TI Permit Process at Memorial City Mall
Tenant improvement permits at Memorial City Mall follow a five-step process. Each step is required. Skipping any step will delay your project.
- Landlord Letter of Authorization from MetroNational’s tenant coordination team. Before you can apply for a city permit, you need written authorization from MetroNational. The tenant coordination team reviews your construction plans to verify they meet building standards and do not interfere with building systems. This approval typically takes 1 to 2 weeks after you submit complete plans.
- Architectural plans meeting MetroNational’s design standards. Your architect must prepare construction drawings that comply with MetroNational’s tenant design criteria. These standards cover partition wall construction, fire-rated assemblies, electrical and plumbing connections, HVAC tie-ins, and fire protection system modifications. MetroNational will reject incomplete or non-compliant plans.
- Submit to City of Houston Public Works Department for plan review. Once MetroNational approves your plans and provides the landlord authorization letter, you submit your permit application to the City of Houston. Houston permits are submitted through the city’s online IRIS portal. You will need the building permit application, all construction drawings, energy calculations, and the landlord authorization letter.
- Address city comments and corrections. City of Houston plan checkers review your drawings for compliance with the International Building Code (IBC), International Fire Code (IFC), and Houston-specific amendments. Most TI projects receive correction comments after the first review. Your architect addresses each comment, revises the drawings, and resubmits. The backcheck review typically takes 5 to 10 business days.
- Permit issuance and construction start. After the City of Houston approves all plans, the city issues your permit. You pay the remaining permit fees, post the permit at the job site, and construction can begin. City building inspectors will visit the site at required milestones during construction.
What’s Happening at Memorial City Mall
Memorial City is undergoing a multi-phase expansion adding residential towers, hotel space, and new retail. Expect increased permit activity through 2027. Plan for potential delays during peak submission periods as the expansion progresses.
Jurisdiction Requirements
Memorial City Mall is located in Houston, Texas, which means all building permits are handled by the City of Houston Public Works Department. Houston has no zoning code, but commercial TI projects still require building permits.
The City of Houston processes commercial tenant improvement permits with typical first-round review times of 10 to 20 business days for standard retail and restaurant TI projects. Houston reviews are faster than most major cities, but incomplete submissions still get rejected at intake.
Memorial City’s tenant coordination team coordinates landlord approvals in parallel with city submissions. This parallel process saves time compared to sequential approvals.
For more information on Houston building permits, review times, and submittal requirements, see our full permit guide for Houston, TX.
Memorial City Mall is also located in Harris County. For county permit information, see our Harris County building permit guide.
FAQ
What permits do I need for a tenant improvement at Memorial City Mall?
Most TI projects at Memorial City Mall require a building permit, electrical permit, plumbing permit, mechanical permit, and fire protection permit. The specific permits depend on the scope of your work. Interior wall construction, new electrical circuits, plumbing fixtures, HVAC modifications, or fire sprinkler relocations all trigger permit requirements. Contact the City of Houston Public Works Department or a permit expediter to confirm which permits your project needs.
How long does the TI permit process take at Memorial City Mall?
The full TI permit process at Memorial City Mall typically takes 5 to 8 weeks from application to permit issuance. This includes 1 to 2 weeks for MetroNational landlord approval, 10 to 20 business days for the first round of City of Houston plan review, and 5 to 10 business days for backcheck after corrections. Projects with incomplete submissions or multiple correction rounds take longer.
Do I need landlord approval before applying for a permit?
Yes. MetroNational must review and approve your construction plans before you can submit a permit application to the City of Houston. The city requires a signed landlord authorization letter from MetroNational with your permit application. Submitting without this letter will result in an intake rejection.
What is a Landlord Letter of Authorization?
A Landlord Letter of Authorization is a signed letter from the property owner (in this case, MetroNational) that gives you permission to perform construction work in the leased space and to apply for building permits on their behalf. The City of Houston requires this letter for all tenant improvement projects. You obtain it from MetroNational’s tenant coordination team after they approve your construction plans.
How can Permit Place help with permits at Memorial City Mall?
Permit Place expedites tenant improvement permits at Memorial City Mall by coordinating with MetroNational’s tenant coordination team, preparing complete permit applications that avoid intake rejections, submitting to the City of Houston Public Works Department, tracking review status daily, and turning around correction responses within 24 to 48 hours. We handle the entire process from landlord approval through certificate of occupancy so your buildout stays on schedule.