Westfield Annapolis Mall Tenant Improvement Permits: What You Need to Know
Westfield Annapolis Mall tenant improvement permits require landlord approval from Brookfield Properties (formerly Westfield) and submission to Anne Arundel County, not the City of Annapolis. Permits route through the County’s Inspections and Permits office. TI projects need building, electrical, plumbing, mechanical, and fire protection permits. Review takes 6 to 10 weeks depending on scope.
About Westfield Annapolis Mall
Westfield Annapolis Mall is a regional shopping center in Annapolis, Maryland. The mall is owned by Brookfield Properties, which acquired the property as part of the Westfield portfolio. Anne Arundel County handles building permits for this location, not the City of Annapolis.
The TI Permit Process at Westfield Annapolis Mall
Tenant improvement projects at Annapolis Mall follow a multi-step process that combines landlord approvals and county permit review.
- Landlord Letter of Authorization from Brookfield Properties: All permit applications require a signed authorization letter from the property owner. Brookfield’s tenant coordination team reviews your construction plans for compliance with mall design standards before issuing this letter. Expect 1 to 3 weeks for landlord approval.
- Architectural plans meeting Brookfield’s design standards: Your architect must prepare construction drawings that comply with Brookfield’s tenant design criteria. These cover storefront design, signage placement, demising walls, utility connections, and after-hours construction requirements. Plans must be stamped by a Maryland-licensed architect or engineer.
- Submit to Anne Arundel County building department for plan review: File your permit application with Anne Arundel County Inspections and Permits, not the City of Annapolis. The County reviews all building, electrical, plumbing, mechanical, and fire protection plans for code compliance. Submit all trade permits simultaneously to reduce total review time.
- Address county comments and corrections: Most TI projects receive correction comments after the first review. Your architect or engineer addresses each comment, revises the drawings, and resubmits. Backcheck review typically takes 5 to 10 business days in Anne Arundel County.
- Permit issuance and construction start: Once all disciplines approve the plans, the County issues your permit. Post the permit at the job site and schedule your first inspection before starting any demolition or construction work.
Jurisdiction Requirements
Anne Arundel County handles all building permits for Westfield Annapolis Mall. The mall sits in Anne Arundel County, so permits route through the County’s Inspections and Permits office. This catches many tenants off guard who assume the City of Annapolis handles permitting.
Brookfield Properties coordinates all tenant approvals following their acquisition of the former Westfield portfolio. The TC team manages landlord authorizations, design reviews, and construction coordination for TI projects.
See the full permit guide for Annapolis, Maryland for general building department information and review timelines.
Frequently Asked Questions
What permits do I need for a tenant improvement at Westfield Annapolis Mall?
You need a building permit, plus separate electrical, plumbing, mechanical, and fire protection permits. Each trade requires its own permit in Anne Arundel County. Restaurants and food service tenants also need health department approval. Submit all permits at the same time for parallel review.
How long does the TI permit process take at Westfield Annapolis Mall?
Anne Arundel County first-round plan review takes 4 to 8 weeks for a standard TI project. Add 1 to 2 weeks for backcheck review after corrections. Total time from submission to permit issuance runs 6 to 10 weeks for office and retail TI. Restaurant projects with fire protection and health department reviews can take 10 to 14 weeks.
Do I need landlord approval before applying for a permit?
Yes. Brookfield Properties must approve your construction plans and issue a signed owner authorization letter before Anne Arundel County will accept your permit application. Landlord approval typically takes 1 to 3 weeks. Start this process early to avoid delays.
What is a Landlord Letter of Authorization?
The Landlord Letter of Authorization is a signed document from the property owner confirming you have permission to perform the proposed construction work. The building department requires this letter as proof that the tenant and landlord agree on the scope of work. Without it, the County will reject your permit application at intake.
How can Permit Place help with permits at Westfield Annapolis Mall?
Permit Place handles the entire TI permit process, from coordinating landlord approvals with Brookfield to submitting complete applications to Anne Arundel County. We track review status daily, respond to correction comments within 24 to 48 hours, and schedule all required inspections. Our clients save 2 to 6 weeks compared to self-filing.