Stuart, FL Building Permits: Review Times, Process and Costs
By Permit Place | Last updated: February 2026
Stuart, FL building permit timeline: Plan review takes 5 to 21 days depending on project type. Contact the building department for current processing times.
Building permit review in Stuart, FL typically takes between 5 and 21 days depending on project type and complexity. Below you will find specific review timelines broken down by permit type, project size, and review stage.
Stuart Plan Review Timeline
- Residential permits: 5 to 10 business days for initial review
- Commercial permits: 10 to 21 business days for initial plan review
- Tenant improvements: 7 to 15 business days depending on scope
- Trade permits (electrical, plumbing, mechanical): 3 to 5 business days
Correction cycles add 5 to 10 business days each. Stuart follows the Florida Building Code, 8th Edition.
Last verified: February 2026 | Source: Stuart Building Department
Need it faster? Permit Place can expedite your Stuart permits
What Building Permits Do You Need in Stuart?
Stuart requires permits for most construction activity. The type of permit depends on your project scope.
Commercial Permits
- New commercial construction: full plan review with the longest timeline
- Tenant improvements and interior buildouts: plan review for structural, electrical, plumbing, and mechanical changes
- Change of use: required when converting building use (for example, retail to restaurant)
- Shell and core: separate from tenant improvement permits
Residential Permits
- New home construction: full plan review including structural, mechanical, electrical, and plumbing
- Additions and remodels: required when modifying structure or adding square footage
- Decks, pools, fences: separate permits with typically faster review
Trade Permits
Individual trade permits are typically required for electrical, plumbing, mechanical (HVAC), and fire sprinkler work.
How the Stuart Permit Review Process Works
Step 1: Application Submission
Submit your permit application through the Stuart building department. Applications are reviewed for completeness before being assigned to a plan reviewer.
Step 2: Plan Review
The city reviews your submitted plans for building code compliance, structural integrity, fire safety, energy code, and ADA accessibility. Commercial projects are reviewed by multiple departments at the same time.
Step 3: Corrections and Resubmittal
If the city issues correction comments, you will need to revise your plans and resubmit. Each correction cycle adds another review period. Most commercial projects go through 2 to 3 correction cycles.
Step 4: Permit Issuance
Once all review departments approve your plans, the building permit is issued. Schedule inspections as work progresses.
Note: These timelines reflect general review periods. Large or complex projects may take longer. Request a quote from Permit Place for a project-specific estimate, or get an instant due diligence report from PermitNow.io.
Stuart Building Permit Costs
Permit fees in Stuart vary based on project type and valuation.
Commercial
- Tenant improvements: $500 to $5,000+
- New commercial construction: $2,000 to $25,000+ (based on valuation)
- Plan review fee: typically 50-65% of the building permit fee
Residential
- Small projects (decks, pools, fences): $50 to $300
- Home additions and remodels: $200 to $2,000+
- New home construction: $1,000 to $10,000+ (based on valuation)
For a detailed permit cost breakdown specific to your project, get a free due diligence report from PermitNow.io.
Trade Permits
- Electrical: $50 to $500
- Plumbing: $50 to $500
- Mechanical: $50 to $500
Fee ranges are estimates. Actual fees depend on project valuation and scope. Contact the Stuart building department or Permit Place for exact costs.
Stuart Building Department
Stuart Building Department
- Website: www.cityofstuart.us/211/Building
- City Website: www.cityofstuart.us
Frequently Asked Questions About Stuart Building Permits
How long does it take to get a building permit in Stuart?
Plan review in Stuart, FL takes 5 to 21 days for the initial review cycle. Projects that receive correction comments will need additional review cycles, each adding time to the total. Most commercial projects go through at least two review cycles before approval.
What is the difference between residential and commercial permit review in Stuart?
Commercial projects in Stuart require review by multiple departments (building, fire, public works, and sometimes health), which adds time. Residential projects typically involve fewer review disciplines and can be processed faster. Tenant improvements fall between the two depending on scope.
Can I speed up the permit process in Stuart?
The most effective way to speed up the permit process in Stuart is to submit complete, code-compliant plans on the first attempt. This reduces correction cycles, which are the primary cause of delays. Permit Place helps ensure your application is complete before submission.
Do I need a permit for a tenant improvement in Stuart?
Yes. Most interior buildouts in Stuart that involve structural changes, electrical work, plumbing, or HVAC modifications require a building permit. Simple cosmetic changes (paint, flooring, non-structural work) typically do not require a permit.
How much does a building permit cost in Stuart?
Permit fees in Stuart are calculated based on project valuation and type. Commercial projects typically pay $500 to $25,000+ in total permit and plan review fees. The exact cost depends on project scope, square footage, and any additional trade permits required.
Can a permit expediter help with my Stuart project?
Yes. Permit Place expedites building permits in Stuart and 600+ other jurisdictions. We handle everything from application preparation through plan review, corrections, and permit issuance. Our clients typically get permits faster because we submit complete applications that reduce correction cycles.
What building permits do I need in Stuart, FL?
Most construction in Stuart requires a building permit. This includes new construction, tenant improvements, change of use, additions, and major renovations. Separate trade permits for electrical, plumbing, mechanical, and fire protection are also typically required. For a project-specific permit requirements report, use PermitNow.io.
Permit Review Times in Other Florida Cities
Need Help With Stuart Building Permits?
Permit Place has helped hundreds of businesses get permits in Stuart and across Florida. We handle everything from application to approval so you can focus on building.