Lake Stevens, WA Building Permits: Review Times, Process and Costs
By Permit Place | Last updated: February 2026
Lake Stevens, WA building permit timeline: Initial plan review takes approximately 3 days. Contact the building department for current processing times.
Building permit review in Lake Stevens, WA takes approximately 3 days for initial plan review. This page covers review timelines, required permits, costs, and how to speed up the process.
Lake Stevens Plan Review Timeline
- Time to review first submittal: The permit center states that applications are reviewed for completeness and accuracy typically within 3 business days, depending on workload and staffing conditions. However, specific details on the plan check process for building permits are not provided.
- Time to review subsequent submittals: There is no specific information available on the time required to review subsequent submittals.
- Other time-related details: For land use applications, Chapter 14.16A.230 outlines time frames for review, but these are generally applicable to Types I through V reviews and are not specific to building permit plan checks. All time frames are indicated as calendar days, not working days, and the day the determination or decision is rendered is not included.
Last verified: June 2025 | Source: Lake Stevens Building Department
Need it faster? Permit Place can expedite your Lake Stevens permits
What Building Permits Do You Need in Lake Stevens?
Lake Stevens requires permits for most construction activity. The type of permit depends on your project scope.
Commercial Permits
- New commercial construction: full plan review with the longest timeline
- Tenant improvements and interior buildouts: plan review for structural, electrical, plumbing, and mechanical changes
- Change of use: required when converting building use (for example, retail to restaurant)
- Shell and core: separate from tenant improvement permits
Residential Permits
- New home construction: full plan review including structural, mechanical, electrical, and plumbing
- Additions and remodels: required when modifying structure or adding square footage
- Decks, pools, fences: separate permits with typically faster review
Trade Permits
Individual trade permits are typically required for electrical, plumbing, mechanical (HVAC), and fire sprinkler work.
How the Lake Stevens Permit Review Process Works
Step 1: Application Submission
Submit your permit application through the Lake Stevens building department. Applications are reviewed for completeness before being assigned to a plan reviewer.
Step 2: Plan Review
The city reviews your submitted plans for building code compliance, structural integrity, fire safety, energy code, and ADA accessibility. Commercial projects are reviewed by multiple departments at the same time.
Step 3: Corrections and Resubmittal
If the city issues correction comments, you will need to revise your plans and resubmit. Each correction cycle adds another review period. Most commercial projects go through 2 to 3 correction cycles.
Step 4: Permit Issuance
Once all review departments approve your plans, the building permit is issued. Schedule inspections as work progresses.
Note: These timelines reflect general review periods. Large or complex projects may take longer. Request a quote from Permit Place for a project-specific estimate, or get an instant due diligence report from PermitNow.io.
Lake Stevens Building Permit Costs
Permit fees in Lake Stevens vary based on project type and valuation.
Commercial
- Tenant improvements: $500 to $5,000+
- New commercial construction: $2,000 to $25,000+ (based on valuation)
- Plan review fee: typically 50-65% of the building permit fee
Residential
- Small projects (decks, pools, fences): $50 to $300
- Home additions and remodels: $200 to $2,000+
- New home construction: $1,000 to $10,000+ (based on valuation)
For a detailed permit cost breakdown specific to your project, get a free due diligence report from PermitNow.io.
Trade Permits
- Electrical: $50 to $500
- Plumbing: $50 to $500
- Mechanical: $50 to $500
Fee ranges are estimates. Actual fees depend on project valuation and scope. Contact the Lake Stevens building department or Permit Place for exact costs.
Lake Stevens Building Department
Lake Stevens Building Department
- Website: www.lakestevenswa.gov/158/Permit-Center
- City Website: www.lakestevenswa.gov
Frequently Asked Questions About Lake Stevens Building Permits
How long does it take to get a building permit in Lake Stevens?
Plan review in Lake Stevens, WA takes approximately 3 days for the initial review cycle. Projects that receive correction comments will need additional review cycles, each adding time to the total. Most commercial projects go through at least two review cycles before approval.
What is the difference between residential and commercial permit review in Lake Stevens?
Commercial projects in Lake Stevens require review by multiple departments (building, fire, public works, and sometimes health), which adds time. Residential projects typically involve fewer review disciplines and can be processed faster. Tenant improvements fall between the two depending on scope.
Can I speed up the permit process in Lake Stevens?
The most effective way to speed up the permit process in Lake Stevens is to submit complete, code-compliant plans on the first attempt. This reduces correction cycles, which are the primary cause of delays. Permit Place helps ensure your application is complete before submission.
Do I need a permit for a tenant improvement in Lake Stevens?
Yes. Most interior buildouts in Lake Stevens that involve structural changes, electrical work, plumbing, or HVAC modifications require a building permit. Simple cosmetic changes (paint, flooring, non-structural work) typically do not require a permit.
How much does a building permit cost in Lake Stevens?
Permit fees in Lake Stevens are calculated based on project valuation and type. Commercial projects typically pay $500 to $25,000+ in total permit and plan review fees. The exact cost depends on project scope, square footage, and any additional trade permits required.
Can a permit expediter help with my Lake Stevens project?
Yes. Permit Place expedites building permits in Lake Stevens and 600+ other jurisdictions. We handle everything from application preparation through plan review, corrections, and permit issuance. Our clients typically get permits faster because we submit complete applications that reduce correction cycles.
What building permits do I need in Lake Stevens, WA?
Most construction in Lake Stevens requires a building permit. This includes new construction, tenant improvements, change of use, additions, and major renovations. Separate trade permits for electrical, plumbing, mechanical, and fire protection are also typically required. For a project-specific permit requirements report, use PermitNow.io.
Permit Review Times in Other Washington Cities
Need Help With Lake Stevens Building Permits?
Permit Place has helped hundreds of businesses get permits in Lake Stevens and across Washington. We handle everything from application to approval so you can focus on building.
Request a Free Quote
Free DD Report
Want to know exactly what permits your project needs? Get an instant due diligence report from PermitNow.io. View a free demo DD report