Edina, MN Building Permits | Review Times and Process

Edina, MN Building Permits Guide

Edina, MN building permit timeline: Plan review takes 10 to 60 days depending on project type. Contact the building department for current processing times.

Building permit review in Edina, MN typically takes between 10 and 60 days depending on project type and complexity. Below you will find specific review timelines broken down by permit type, project size, and review stage.

Edina Plan Review Timeline

No specific information regarding the time to review the first submittal or subsequent submittals for building or planning permits was located on the official Edina, MN building department or city websites for generic building permit plan checks. The Edina building department information page lists hours and contact details, but does not specify plan check timelines. The general rule of thumb for permit issuance is 5–10 business days for residential permits and 15 business days for commercial permits, but this does not detail plan check (review) timelines specifically. No mention of first or subsequent submittal review times or additional time-related details is present on the referenced sites.

The Planning Commission section notes that if an application is deemed complete, the city has up to 60 days to make a decision (normally about 45 days), with possible extensions, but this refers to planning commission decisions, not plan check or building permit review times.

No clear data for building plan check review timelines was found.

Last verified: June 2025 | Source: Edina Building Department

Need it faster? Permit Place can expedite your Edina permits

What Building Permits Do You Need in Edina?

Edina requires permits for most construction activity. The type of permit depends on your project scope.

Commercial Permits

  • New commercial construction: full plan review with the longest timeline
  • Tenant improvements and interior buildouts: plan review for structural, electrical, plumbing, and mechanical changes
  • Change of use: required when converting building use (for example, retail to restaurant)
  • Shell and core: separate from tenant improvement permits

Residential Permits

  • New home construction: full plan review including structural, mechanical, electrical, and plumbing
  • Additions and remodels: required when modifying structure or adding square footage
  • Decks, pools, fences: separate permits with typically faster review
Need a project-specific permit report? Try PermitNow.io, our AI-powered due diligence tool that researches exactly what permits your project requires, what documents to prepare, and how to submit. Works for residential and commercial projects. View a free demo DD report

Trade Permits

Individual trade permits are typically required for electrical, plumbing, mechanical (HVAC), and fire sprinkler work.

Request a Free Quote

How the Edina Permit Review Process Works

Step 1: Application Submission

Submit your permit application through the Edina building department. Applications are reviewed for completeness before being assigned to a plan reviewer.

Step 2: Plan Review

The city reviews your submitted plans for building code compliance, structural integrity, fire safety, energy code, and ADA accessibility. Commercial projects are reviewed by multiple departments at the same time.

Step 3: Corrections and Resubmittal

If the city issues correction comments, you will need to revise your plans and resubmit. Each correction cycle adds another review period. Most commercial projects go through 2 to 3 correction cycles.

Step 4: Permit Issuance

Once all review departments approve your plans, the building permit is issued. Schedule inspections as work progresses.

Note: These timelines reflect general review periods. Large or complex projects may take longer. Request a quote from Permit Place for a project-specific estimate, or get an instant due diligence report from PermitNow.io.

Edina Building Permit Costs

Permit fees in Edina vary based on project type and valuation.

Commercial

  • Tenant improvements: $500 to $5,000+
  • New commercial construction: $2,000 to $25,000+ (based on valuation)
  • Plan review fee: typically 50-65% of the building permit fee

Residential

  • Small projects (decks, pools, fences): $50 to $300
  • Home additions and remodels: $200 to $2,000+
  • New home construction: $1,000 to $10,000+ (based on valuation)

For a detailed permit cost breakdown specific to your project, get a free due diligence report from PermitNow.io.

Trade Permits

  • Electrical: $50 to $500
  • Plumbing: $50 to $500
  • Mechanical: $50 to $500

Fee ranges are estimates. Actual fees depend on project valuation and scope. Contact the Edina building department or Permit Place for exact costs.

Edina Building Department

Frequently Asked Questions About Edina Building Permits

How long does it take to get a building permit in Edina?

Plan review in Edina, MN takes 10 to 60 days for the initial review cycle. Projects that receive correction comments will need additional review cycles, each adding time to the total. Most commercial projects go through at least two review cycles before approval.

What is the difference between residential and commercial permit review in Edina?

Commercial projects in Edina require review by multiple departments (building, fire, public works, and sometimes health), which adds time. Residential projects typically involve fewer review disciplines and can be processed faster. Tenant improvements fall between the two depending on scope.

Can I speed up the permit process in Edina?

The most effective way to speed up the permit process in Edina is to submit complete, code-compliant plans on the first attempt. This reduces correction cycles, which are the primary cause of delays. Permit Place helps ensure your application is complete before submission.

Do I need a permit for a tenant improvement in Edina?

Yes. Most interior buildouts in Edina that involve structural changes, electrical work, plumbing, or HVAC modifications require a building permit. Simple cosmetic changes (paint, flooring, non-structural work) typically do not require a permit.

How much does a building permit cost in Edina?

Permit fees in Edina are calculated based on project valuation and type. Commercial projects typically pay $500 to $25,000+ in total permit and plan review fees. The exact cost depends on project scope, square footage, and any additional trade permits required.

Can a permit expediter help with my Edina project?

Yes. Permit Place expedites building permits in Edina and 600+ other jurisdictions. We handle everything from application preparation through plan review, corrections, and permit issuance. Our clients typically get permits faster because we submit complete applications that reduce correction cycles.

What building permits do I need in Edina, MN?

Most construction in Edina requires a building permit. This includes new construction, tenant improvements, change of use, additions, and major renovations. Separate trade permits for electrical, plumbing, mechanical, and fire protection are also typically required. For a project-specific permit requirements report, use PermitNow.io.

Need Help With Edina Building Permits?

Permit Place has helped hundreds of businesses get permits in Edina and across Minnesota. We handle everything from application to approval so you can focus on building.

Dedicated permit expediter
Commercial and residential
Tenant improvements and TI
Corrections and resubmittals
Faster than self-filing
600+ jurisdictions nationwide

Request a Free Quote
Free DD Report

Want to know exactly what permits your project needs? Get an instant due diligence report from PermitNow.io. View a free demo DD report

Schedule Time to Talk

Quick Answer

A building permit in Edina, MN is a legal authorization from the Edina Building Department required before starting any commercial construction, renovation, or tenant improvement project. The permit confirms that proposed work meets local building codes, zoning ordinances, fire safety standards, and ADA accessibility requirements per the International Building Code (IBC).

Edina Building Permit FAQ

How long does it take to get a building permit in Edina, MN?

Commercial building permit review in Edina, MN typically takes 4 to 12 weeks depending on project scope, plan review backlog, and whether corrections are required. Permit Place clients in Edina often see timelines reduced by 30-60% through proactive management and early coordination with the Edina Building Department.

How much does a commercial building permit cost in Edina, MN?

Commercial building permit fees in Edina, MN vary based on project valuation, square footage, and permit type. Most tenant improvement permits range from $2,000 to $15,000 in city fees. Plan review fees, fire department review, and third-party inspection fees are typically additional.

Can I expedite my building permit in Edina, MN?

Yes. Many jurisdictions including Edina offer expedited or priority plan review for an additional fee. Permit Place also reduces timelines by preparing correction-free submittals, scheduling pre-application meetings, and maintaining direct contact with plan reviewers at the Edina Building Department.

What documents do I need for a building permit in Edina, MN?

A commercial building permit application in Edina, MN typically requires: stamped architectural and structural drawings, a completed permit application form, proof of ownership or tenant authorization, contractor license information, energy compliance documents (Title 24 in California or local equivalent), and fire sprinkler or alarm plans if applicable.

Does Edina require plan review for tenant improvements?

Yes. Edina requires plan review for most commercial tenant improvement projects, including interior renovations that affect structural, mechanical, electrical, or plumbing systems. Minor cosmetic changes such as paint or carpet may be exempt, but any work involving walls, ceilings, or building systems requires a permit from the Edina Building Department.

Edina, MN Permit Process at a Glance

FactorTypical Range
Permit Review Timeline4 - 12 weeks (varies by project scope)
TI Permit Fee Range$2,000 - $15,000 (based on valuation)
Plan Review RequiredYes, for all commercial construction
Online SubmissionAvailable in most jurisdictions
Fire Dept. ReviewRequired for occupied commercial spaces
With Permit Expediter30-60% faster timelines on average
Key FactsEdina, MN Building Permits

Issuing Authority

Edina Building Department

Review Timeline

4 - 12 weeks for commercial permits

TI Permit Fees

$2,000 - $15,000 typical range

Building Code

International Building Code (IBC)

Expediting

Available through Permit Place

Permit Place Contact

877-277-4289 | [email protected]

Get a Free Quote for Edina

Sources and References