Daytona Beach, FL Building Permits | Review Times and Process

Daytona Beach, FL Building Permits: Review Times, Process and Costs

Daytona Beach, FL building permit timeline: Initial plan review takes approximately 10 days. Expedited review is not currently offered.

Building permit review in Daytona Beach, FL takes approximately 10 days for initial plan review. The city does not currently offer expedited plan review. Here is what you need to know about permit timelines, costs, and the review process in Daytona Beach.

Daytona Beach Plan Review Timeline

  • Initial Handling: In Daytona Beach, it generally takes between 5 to 10 days for building officials to assign a plan check reviewer to your permit application.
  • First Submission: Once your application is accepted, the review and approval process typically spans 5 to 10 days.
  • Additional Submissions: Should your permit application require further evaluation after initial comments or corrections, each subsequent review round is completed within 5 to 10 days.

Note: The city of Daytona Beach does not offer an expedited review option.

Last verified: June 2025 | Source: Daytona Beach Building Department

Need it faster? Permit Place can expedite your Daytona Beach permits

What Building Permits Do You Need in Daytona Beach?

Daytona Beach requires permits for most construction activity. The type of permit depends on your project scope.

Commercial Permits

  • New commercial construction: full plan review with the longest timeline
  • Tenant improvements and interior buildouts: plan review for structural, electrical, plumbing, and mechanical changes
  • Change of use: required when converting building use (for example, retail to restaurant)
  • Shell and core: separate from tenant improvement permits

Residential Permits

  • New home construction: full plan review including structural, mechanical, electrical, and plumbing
  • Additions and remodels: required when modifying structure or adding square footage
  • Decks, pools, fences: separate permits with typically faster review
Need a project-specific permit report? Try PermitNow.io, our AI-powered due diligence tool that researches exactly what permits your project requires, what documents to prepare, and how to submit. Works for residential and commercial projects. View a free demo DD report

Trade Permits

Individual trade permits are typically required for electrical, plumbing, mechanical (HVAC), and fire sprinkler work.

Request a Free Quote

How the Daytona Beach Permit Review Process Works

Step 1: Application Submission

Submit your permit application through the Daytona Beach building department. Applications are reviewed for completeness before being assigned to a plan reviewer.

Step 2: Plan Review

The city reviews your submitted plans for building code compliance, structural integrity, fire safety, energy code, and ADA accessibility. Commercial projects are reviewed by multiple departments at the same time.

Step 3: Corrections and Resubmittal

If the city issues correction comments, you will need to revise your plans and resubmit. Each correction cycle adds another review period. Most commercial projects go through 2 to 3 correction cycles.

Step 4: Permit Issuance

Once all review departments approve your plans, the building permit is issued. Schedule inspections as work progresses.

Note: These timelines reflect general review periods. Large or complex projects may take longer. Request a quote from Permit Place for a project-specific estimate, or get an instant due diligence report from PermitNow.io.

Daytona Beach Building Permit Costs

Permit fees in Daytona Beach vary based on project type and valuation.

Commercial

  • Tenant improvements: $500 to $5,000+
  • New commercial construction: $2,000 to $25,000+ (based on valuation)
  • Plan review fee: typically 50-65% of the building permit fee

Residential

  • Small projects (decks, pools, fences): $50 to $300
  • Home additions and remodels: $200 to $2,000+
  • New home construction: $1,000 to $10,000+ (based on valuation)

For a detailed permit cost breakdown specific to your project, get a free due diligence report from PermitNow.io.

Trade Permits

  • Electrical: $50 to $500
  • Plumbing: $50 to $500
  • Mechanical: $50 to $500

Fee ranges are estimates. Actual fees depend on project valuation and scope. Contact the Daytona Beach building department or Permit Place for exact costs.

Daytona Beach Building Department

Daytona Beach Building Department

Frequently Asked Questions About Daytona Beach Building Permits

How long does it take to get a building permit in Daytona Beach?

Plan review in Daytona Beach, FL takes approximately 10 days for the initial review cycle. Projects that receive correction comments will need additional review cycles, each adding time to the total. Most commercial projects go through at least two review cycles before approval.

Does Daytona Beach offer expedited permit review?

Daytona Beach does not currently offer a formal expedited review program. However, submitting complete, code-compliant plans on the first attempt is the best way to reduce total review time. Permit Place helps ensure your application is complete before submission.

Do I need a permit for a tenant improvement in Daytona Beach?

Yes. Most interior buildouts in Daytona Beach that involve structural changes, electrical work, plumbing, or HVAC modifications require a building permit. Simple cosmetic changes (paint, flooring, non-structural work) typically do not require a permit.

How much does a building permit cost in Daytona Beach?

Permit fees in Daytona Beach are calculated based on project valuation and type. Commercial projects typically pay $500 to $25,000+ in total permit and plan review fees. The exact cost depends on project scope, square footage, and any additional trade permits required.

Can a permit expediter help with my Daytona Beach project?

Yes. Permit Place expedites building permits in Daytona Beach and 600+ other jurisdictions. We handle everything from application preparation through plan review, corrections, and permit issuance. Our clients typically get permits faster because we submit complete applications that reduce correction cycles.

What building permits do I need in Daytona Beach, FL?

Most construction in Daytona Beach requires a building permit. This includes new construction, tenant improvements, change of use, additions, and major renovations. Separate trade permits for electrical, plumbing, mechanical, and fire protection are also typically required. For a project-specific permit requirements report, use PermitNow.io.

Need Help With Daytona Beach Building Permits?

Permit Place has helped hundreds of businesses get permits in Daytona Beach and across Florida. We handle everything from application to approval so you can focus on building.

Dedicated permit expediter
Commercial and residential
Tenant improvements and TI
Corrections and resubmittals
Faster than self-filing
600+ jurisdictions nationwide

Request a Free Quote
Free DD Report

Want to know exactly what permits your project needs? Get an instant due diligence report from PermitNow.io. View a free demo DD report

Schedule Time to Talk